2.2 B
ENCH
T
EST
– P
OWER
S
UPPLY
C
ONFIGURATION
Connect Oak Board to the power supply:
Follow the instructions below.
1) Connect the supplied cables to the Mean Well power supply and the plug labeled Power on the Oak board. Connect
position 1 and 2 from H1 on the Oak Board to V4 and COM respectively.
2) Splice a 110 V power cord to the power supply AC input. Live to L, Neutral to N, and Ground to ground.
Page 9 of 72
2.2 Bench Test – Power Supply Configuration
T:\_Docs working\Oak Board Manual\Oakboard install manual V2 4-10-15.odt
Figure 2.2.1
Power Supply Connected
to Oak Board
Twisted Wires Not Included
Hot 110 V (cable not included)
Neutral 110 V (cable not included)
Ground 110V (cable not included)
V3, +24 V (H2 position 1)
-V4 (-12 V)
+V2 V (+12 V)
COM (multiple wires)
+5 V
110 V from power strip
(not included)
COM
Black
Gnd
Green
+V2 V
Yellow
+5V
Red
COM
Black
-V4
Blue
Looking at front of plug
Summary of Contents for OAK
Page 3: ......