Page 8
SKU 90589
For technical questions, please call 1-800-444-3353.
REV 07g
lOCKING HANdlE bAR (142)
HEx VERTICAl ARM (120)
MOUNTING HEAd (123)
JAW (203)
TURNTAblE (201)
bEAd lIFTING lEVER (13)
INFlATION pEdAl (IT106)
TIlTING pEdAl (404)
ClAMpING pEdAl (403)
bEAd bREAKER pEdAl (402)
REVERSE pEdAl (401)
RUbbER WHEEl SUppORT (3 & 11)
SHOVEl (315)
bEAd bREAKER ARM (321)
FIlTER & pRESSURE
R lUbR. (IT207)
AIR TANK (IT1)
VERTICAl COlUMN (101)
FIGURE A
7.
Vertical column assembly procedure:
With assistance, place the Column (1, Fig. B-1)
1)
in its seating on the Body Assembly (2, Fig. B-1).
Push the Air Hose (3, Fig. B-1) through the large
round hole into the body.
Insert the Pin (13, Fig. B-1) through the column as
2)
shown in Fig. B-1 and fasten it with Screws (14,
Fig. B-1)
and Washers (15, Fig. B-1).
Using the Screw (17, Fig. B-1) tighten with the
3)
Self- Locking Nut (16, Fig. B-1) to connect the Pin
(18, Fig. B-1) of the post tilting cylinder.
Remove the four Screws (4, Fig. B-1) from the left
4)
Side Cover (6, Fig. B-1) and remove it. Connect
the Air Hose (3, Fig. B-1) from the column to the
6mm Connector (5, Fig. B-1).
Replace the Side Cover (6, Fig. B-1) and fasten it
5)
with the Screws (4, Fig. B-1).
Install the plastic guard and fix it with the two Cap
6)
Screws (10, Fig. B-1).
Fix the Metal Sheeting Guard (11, Fig. B-1) to the back of the vertical column (1, Fig.
7)
B-1) using the two Cap Screws (12, Fig. B-1).
FIGURE b-1