15
GB
Contents
1. General
1.1 Safety
1.1.1 Maintenance and monitoring
1.1.2 Using original parts
1.1.3 Operating the filling station
1.1.4 Warning notices on the filling station
1.2 Correct usage
1.2.1 DT-Mobil Easy with ADR approval
1.2.2 DT-Mobil Easy to ADR 1.1.3.1 c)
1.2.3 Summary
1.3 Inappropriate use
2. Technical data
2.1 Tank
2.2 Pump
2.3 Delivery nozzle
3. Layout
4. Using the equipment for the first time
5. Operation
5.1 Storage
5.2 Loading...
5.2.1 ...by hand
5.2.2 ... with forklift
5.2.3 ... with crane
5.3 Transporting
5.4 Filling the tank
5.5 Filling
6. Accessories
6.1 Flap lid
6.2 Flow meter, digital
6.3 Level indicator
7. Maintenance and inspection
7.1 Safety measures
7.2 Maintenance and inspection table
8. Taking out of service
8.1 Taking out of service after expiry of the
ADR approval
8.2 Decommissioning
9. Warranty
10. Inspection protocol
11. Declarations of Conformity
DT-Mobil Easy with ADR approval
DT-Mobil Easy to ADR 1.1.3.1 c)
12. BAM approval certificates
DT-Mobil Easy 200 l
DT-Mobil Easy 460 l and 600 l
Operating Instructions
• provide to operator
• must be read before using the
equipment for the first time
• retain for future use
15 - 27
Summary of Contents for DT-Mobil Easy 125l
Page 119: ...119 GB D ...
Page 120: ...120 GB D ...
Page 121: ...121 GB D ...
Page 122: ...122 GB D ...
Page 123: ...123 GB D ...
Page 124: ...124 GB D ...
Page 125: ...125 GB D ...
Page 126: ...126 GB D ...
Page 127: ...127 GB D ...
Page 128: ...128 GB D ...
Page 129: ...129 GB D ...
Page 130: ...130 GB D ...
Page 131: ...131 GB D ...
Page 132: ...132 Notizen ...
Page 133: ...133 Notizen ...
Page 134: ...134 Notizen ...
Page 135: ...135 Notizen ...