71
Fig. 28.10
E:
On the Back of the fort measure 21-5/8” from (2759) Roof End and 1-1/4” down from the top of (2677) Narrow
Panel, pre-drill with a 3/16” drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and flush to the top
of (2677) Narrow Panel attach from the inside with 1 (S4) #8 x 3” Wood Screw and from the outside with 1 (S3) #8 x
2-1/2” Wood Screws. (fig. 28.9 and 28.10)
F:
On the Front of the fort measure 21-5/8” from (2759) Roof End and 1-1/4” down from the top of the panel, pre-
drill with a 3/16” drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and flush to the top of the
(2677) Narrow Panel and attach from the inside with 1 (S4) #8 x 3” Wood Screw and from the outside with 1 (S3) #8
x 2-1/2” Wood Screws. (fig. 28.12 and 28.11)
Step 28: Attach Roof Ends
Part 4
Flush
Flush
Front Wall
Fig. 28.11
2677
2759
Fig. 28.9
2684
2684
2677
2677
2684
2759
Flush
Flush
Back Wall
Hardware
2 x
Mid Roof End 1-1/4 x 4-7/8 x 7”
Wood Parts
2684
2 x
#8 x 2-1/2” Wood Screw
2 x
#8 x 3” Wood Screw
S3
S4
S3
S3
S4
S4
2677
2684
21-5/8”
21-5/8”
Front
Wall
Back
Wall
End Wall
Fig. 28.12