37
Warning!
To prevent tipping and avoid potential injury, stakes
must be driven 13” into ground. Digging or driving stakes can be
dangerous if you do not check first for under-ground wiring, cables or
gas lines.
A:
In the 6 places shown in fig. 10.1 drive the Rebar Ground Stakes 13” into the ground on both (2607) (8587)
Diagonals, and both (2613) Heavy SW Posts. Drive 1 Rebar Ground Stake 13” into the ground on (2608) Floor
Joist. Be careful not to hit the washer while hammering stakes into the ground as this could cause the washer to
break off.
B:
Attach ground stakes using 1 (S7) #12 x 2” Pan Screw per ground stake (fig. 10.1,10.2 and 10.3).
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Step 10: Install Ground Stakes
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Hardware
7 x
#12 x 2” Pan Screw
7 x Rebar Ground Stake
Other Parts
SEE FRONT COVER
FOR SAFETY CLEARANCE
Rebar
Ground
Stake
13”
In Ground
Fig. 10.1
Fig. 10.2
Fig. 10.3
S7
2613
8587
S7
13”
In Ground
Rebar
Ground
Stake
Front
2607
x2
x2
2608
S7
2608