Page
18
of
41
FIBRE INSTALLATION
To begin an installation first power up the machine. With the remote unit
already plugged in, insert the power cable into the rear of the machine. The
LCD display on the remote unit should now power up with the following
display:
Select the option by pressing the
relevant blue button under either
YES or NO depending on the type of
installation you wish to carry out
and the plates fitted to the machine.
The buckle sensor utilises plates
with the buckle shuttle - this can be
seen in the photo at the top of the previous page. Should the wrong selection
be made this can be altered in the menu system, this is detailed later in this
section.
Once the selection is made, a confirmation screen is briefly displayed
followed by one of the screens below:
If a job has not been finished then it will remain active in memory and the
screen on the right will be visible. It is then possible to either resume that job
or start a new job. The blue buttons allow navigation through the menus and
the functions of these buttons are displayed on the screen. Starting a new job
will present you with the following display.