3
Installation
Installation of the AirLaser IP1000plus-system is possible quick and easy in three steps:
Select locations (3.1)
Cabling (3.2)
Mounting and adjustment (3.3)
3.1 Select locations
Criteria for the selection of the locations and the beam run:
Direct line of sight is mandatory. Use only stable and vibration free ground.
Interruptions by persons should be impossible.
No chimneys should be near or under the beam run. Smoke absorbs the infrared light.
No outlets of warm air or water vapour should be near or under the beam rund.
Turbulences have influence to the infrared light. Take care with air condition systems.
Trees or cranes can interrupt the beam.
Free access to the backpanel is necessary.
If possible, use a location which is protected against unlimited wind, rain, snowfall and
sun radiation.
Recommendation:
The extension of the beam should not look to the sun. Interruptions of several minutes can occur, if
the sun blinds the receiver.
Orbit of the Sun in the course of a day.
6