background image

IV - STARTING UP

MAIN ISOLATING SWITCH

- Open the compressed air source (4 bar: factory setting).
- Switch on the machine: main isolating switch at top right of
the machine (see CS 960 description page A).
Indicator lamp 3 (see Control panel, page 7) lights.
This indicator only lights when the CS 960  is  energised.

PRESSURE

REGULATING

VAVLE

Unlock button 5 then press button 4 (see Control panel, page 7).
Check the direction of rotation of the two blades, i.e.:

     - clockwise for the left blade,
     - anti-clockwise for the right blade.

If the direction is not correct, press button 5 (see Control panel, page 7), disconnect the machine and reverse the
two phases of the power supply cable.

1

2

Use a supply hose of inner dia. 8 mm withstanding the maximum pressure of the source, which
must not be less than 4 bar. Source characteristics: dry, non lubricated air.

Electrical connection

The user must connect the power supply cable to a source complying with the regulations in
force and protect the machine by fitting fuses: 25 Amp aM for 220 Volt single-phase and 16
Amp aM for 380/220 Volt 3-phase.

To conform to hygiene standards, the machine must be connected to an
extraction system producing a maximum flow rate of 28 m

3

/second over

a diameter of 100 mm. The circuit comprises 2 nozzles 100 mm in
diameter at the rear of the machine. This installation guarantees effective
extraction and must never be dismantled or modified.

Pneumatic connection

Dust extraction

USA FITTING

COMPRESSOR

SAW PRESSURE

REGULATING

VALVE

FEMALE QUICK-FIT

CONNECTOR

Z 675

Z 749

Z 701

Z 556

STANDARD

BARBED

FITTING

Pedal connection

Connect the pedal as follows:

-

BLUE TRANSPARENT

  tube in

position

1

-

RED

tube in position

4

-

BLUE

or

CLEAR TRANSPARENT

tube in position

2

2

3

5

4

1

BLEU

RED

TRANSPARENT

OFF

ON

2

BLUE

MD

6

Summary of Contents for CS 960

Page 1: ...CS 960 Cassese Communication Z15768 Manual Operated Double Mitre Saw 45 Instructions for Use Technical Data VERSION 2 09 2005...

Page 2: ...ft horizontal clamp Left horizontal clamp handle Machine identity plate LEFT SIDE OF MACHINE Electrical contactor RIGHT SIDE OF MACHINE Air supply Right vertical clamp handle Right vertical clamp opti...

Page 3: ...kW Extraction nozzle ext dia 2x100 mm Extraction compliant with standards 28 m3 s at 4 m for 100 Air supply 4 bar min 4 to 6 bar Max consumption 2 3l cycle Weight 950 kg 58 710 Kg 57 Noise compulsory...

Page 4: ...C...

Page 5: ...st extraction 6 IV START UP Control panel 6 7 V SAWING Horizontal clamp setting 7 Vertical clamp setting 8 First cut on the left 8 Measuring the first piece 9 Cutting the first piece 10 VI PREVENTIVE...

Page 6: ...ade carriage ensures operator safety by keeping hands out of range of the blades The electrical control equipment is installed in a cabinet at the front of the machine The pneumatic equipment is insta...

Page 7: ...G Using a screwdriver open the crate fasteners then remove the lid and 4 sides Leaving the protection in place remove 1 the accessories box the left and right blade carriage arms and the left table ex...

Page 8: ...iel de levage Horquillas del equipo de elevaci n Forks of the lifting equipment Once the machine is installed removed the protection Open the removable panel at the rear of the machine after removing...

Page 9: ...after adjustment and levelling As the work surface is 900 mm from the floor it may be necessary to have a platform available for operator of short stature B CE Assembling the left and right tables Ope...

Page 10: ...2 rule supports until it is stopped by screws R and B Screw the extension to the frame at A and B using screws A and B Secure the cylindrical support of the bracket using screw F Tighten screws 1 2 3...

Page 11: ...Source characteristics dry non lubricated air Electrical connection The user must connect the power supply cable to a source complying with the regulations in force and protect the machine by fitting...

Page 12: ...move to UNCLAMPING position Keep the pedal pressed with your foot throughout setting Release the left clamp handle M and move the pressor to roughly 1 cm from the profile edge then retighten handle M...

Page 13: ...ing the measuring operations IMPORTANT When the cut is made the right clamp must always be in contact with the bottom of the slot and never press against the cut part of the moulding If the latter is...

Page 14: ...ng screw Press the pedal to release the clamps Move the moulding to the cursor aligning the edge of the slot base with the 45 angle MEASURING THE OUTSIDE DIMENSION CURSOR RULE LOCKING SCREW READING PO...

Page 15: ...lease the piece of cut moulding from the right hand side Slide the moulding pushing it from the left table towards the right table END OF MOULDING Clamping and cutting are visible to the operator He m...

Page 16: ...main isolating switch Lock the main case by screwing the cover safety screw fully home REFITTING THE BLADES IMPORTANT REMOVING THE BLADES Disconnect the air supply Switch off the machine at the main...

Page 17: ...g hours a day Cleaning Clean the plexiglass screen with a soft cloth Clean the offcut outlet hopper Belt inspection Every 3 months Blade sharpening Cutting quality depends on the sharpness of the blad...

Reviews: