III - SETTING UP THE MACHINE

There must be sufficient clearance around the machine to allow free
movement and access for maintenance (see page C).
The CS 960 must be installed on a stable, flat floor capable of
supporting its weight (950 kg). Before making any electrical and
pneumatic connections, level the machine by means of the adjustable
feet.
Use a  24-mm open-end spanner on lock nut CE and a 12-mm open-
end spanner for base B. Tighten lock nut CE firmly after adjustment
and levelling.
As the work surface is 900 mm from the floor it may be necessary to
have a platform available for operator of short stature.

B

CE

Assembling the left and right tables

Open the main case by fully
loosening safety screw VS
and releasing left and right
spring clips SG / SD.

SG

SD

VS

Remove screws A, B and C, D (on the right and left sides of the
machine frame) and screws E, F of the cylindrical suppports (on
the extension support brackets) with a 5-mm Allen key.

A                        B

C                  D

E      F

The cutting table has 2 series of 3 screws and 2 rule supports R, which secure the right and left stops BD and
BG.

BG

BD

BMI

BMI

BD

BG

R

R

V

V

4

 1                    2               3

3                2                    1

Summary of Contents for CS 960

Page 1: ...CS 960 Cassese Communication Z15768 Manual Operated Double Mitre Saw 45 Instructions for Use Technical Data VERSION 2 09 2005...

Page 2: ...ft horizontal clamp Left horizontal clamp handle Machine identity plate LEFT SIDE OF MACHINE Electrical contactor RIGHT SIDE OF MACHINE Air supply Right vertical clamp handle Right vertical clamp opti...

Page 3: ...kW Extraction nozzle ext dia 2x100 mm Extraction compliant with standards 28 m3 s at 4 m for 100 Air supply 4 bar min 4 to 6 bar Max consumption 2 3l cycle Weight 950 kg 58 710 Kg 57 Noise compulsory...

Page 4: ...C...

Page 5: ...st extraction 6 IV START UP Control panel 6 7 V SAWING Horizontal clamp setting 7 Vertical clamp setting 8 First cut on the left 8 Measuring the first piece 9 Cutting the first piece 10 VI PREVENTIVE...

Page 6: ...ade carriage ensures operator safety by keeping hands out of range of the blades The electrical control equipment is installed in a cabinet at the front of the machine The pneumatic equipment is insta...

Page 7: ...G Using a screwdriver open the crate fasteners then remove the lid and 4 sides Leaving the protection in place remove 1 the accessories box the left and right blade carriage arms and the left table ex...

Page 8: ...iel de levage Horquillas del equipo de elevaci n Forks of the lifting equipment Once the machine is installed removed the protection Open the removable panel at the rear of the machine after removing...

Page 9: ...after adjustment and levelling As the work surface is 900 mm from the floor it may be necessary to have a platform available for operator of short stature B CE Assembling the left and right tables Ope...

Page 10: ...2 rule supports until it is stopped by screws R and B Screw the extension to the frame at A and B using screws A and B Secure the cylindrical support of the bracket using screw F Tighten screws 1 2 3...

Page 11: ...Source characteristics dry non lubricated air Electrical connection The user must connect the power supply cable to a source complying with the regulations in force and protect the machine by fitting...

Page 12: ...move to UNCLAMPING position Keep the pedal pressed with your foot throughout setting Release the left clamp handle M and move the pressor to roughly 1 cm from the profile edge then retighten handle M...

Page 13: ...ing the measuring operations IMPORTANT When the cut is made the right clamp must always be in contact with the bottom of the slot and never press against the cut part of the moulding If the latter is...

Page 14: ...ng screw Press the pedal to release the clamps Move the moulding to the cursor aligning the edge of the slot base with the 45 angle MEASURING THE OUTSIDE DIMENSION CURSOR RULE LOCKING SCREW READING PO...

Page 15: ...lease the piece of cut moulding from the right hand side Slide the moulding pushing it from the left table towards the right table END OF MOULDING Clamping and cutting are visible to the operator He m...

Page 16: ...main isolating switch Lock the main case by screwing the cover safety screw fully home REFITTING THE BLADES IMPORTANT REMOVING THE BLADES Disconnect the air supply Switch off the machine at the main...

Page 17: ...g hours a day Cleaning Clean the plexiglass screen with a soft cloth Clean the offcut outlet hopper Belt inspection Every 3 months Blade sharpening Cutting quality depends on the sharpness of the blad...

Reviews: