5 - TRANSPORT OPERATIONS
12. Measure the distance between the ground and the
highest point of the machine. You must know the
overall height.
SMIL13CEX2726AB
10
Unloading
1. Remove the blocks and fastening chains.
2. Start the engine.
3. Push the gate lock lever (safety bar) forward.
4. Raise the dozer blade (if equipped).
5. (Machine with attachment)
Raise the attachment to bring it a few centimetres
above the trailer bed.
6. Select low travel speed.
7. Move the machine forward slowly, raising the attach-
ment (if equipped) so as to keep it a few centimetres
off the ground.
8. Turn the rear view mirrors back to their correct posi-
tion.
9. (Machine without attachment)
Install the attachment and the counterweight.
NOTICE:
when the attachment has been installed, all air
must be removed from the hydraulic circuit and the ma-
chine must be tested for correct operation. Do not forget
to check the oil level.
5-5
Summary of Contents for CX75C SR
Page 14: ...1 GENERAL INFORMATION Machine components SMIL13CEX2515FB 1 SMIL13CEX2906FB 2 1 8 ...
Page 33: ...2 SAFETY INFORMATION SMIL13CEX2925HB 4 2 17 ...
Page 48: ...2 SAFETY INFORMATION 2 32 ...
Page 230: ...6 MAINTENANCE 6 84 ...
Page 241: ...8 SPECIFICATIONS Work range standard model SMIL13CEX2899HB 5 8 9 ...
Page 243: ...8 SPECIFICATIONS Work range blade type SMIL13CEX2900HB 6 8 11 ...
Page 248: ...8 SPECIFICATIONS 8 16 ...
Page 255: ......