background image

KGAET0201ETK: Installation Instructions

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

5

Table 2 – Approved Combustion-Air Vent Pipe, Fitting and Cement Materials (U.S.A. Installation)

Prepare the Furnace Internal Trap

These  instructions  MUST  be  followed  in  order  to  provide  for  safe

operation of the furnace.

1. Position the furnace in its final operating orientation.
2. Configure the internal furnace drain trap as shown in the furnace

installation instructions for that orientation.

3. Once the drain trap configuration is complete as described in the

furnace installation instructions, remove the internal furnace drain

trap  and  install  the  Internal  Drain Trap  Plug  as  shown  in 

Fig. 3

,

FOR THAT ORIENTATION. Re-install the furnace drain trap.

4. Complete DRY FIT assembly of the field-supplied drainage system

drain lines as shown in the appropriate 

Fig. 4

 through 

Fig. 7

, and as

directed in the furnace installation instructions.

5. IF ALLOWED BY LOCAL CODE, it is recommended that a short

piece (6-in./15 cm) of clear tubing be applied near the exit of each

trap to allow observation of correct drain trap operation.

6. DO  NOT  cement  drain  lines  at  this  time.  See  Drainage  System

Layout and Installation section.

MATERIALS

USA

1. All  pipe,  fittings,  primers*,  and  solvents*  must  conform  to American  National  Standards  Institute  (ANSI)  standards  and

American Society for Testing and Materials (ASTM) standards or ULC S636 where required by code.
2. See Table below for approved materials for use in the U.S.A.
3. ULC S636 vent systems must be composed of pipe, fittings, cements, and primers from the same supplier.
4. Factory accessory concentric vent kits are ULC S636 listed.

CANADA

1. Installation in Canada must conform to the requirements of CAN/CSA B149 code.
2. Vent systems must be composed of pipe, fittings, cements, and primers from the same supplier and listed to ULC S636.
3. Not all materials below may be approved or listed to ULC S636.
4. Royal Pipe and IPEX are approved suppliers of ULC S636 pipe, fittings, cements and primers*.
5. Factory accessory concentric vent kits are ULC S636 listed for use with Royal Pipe and IPEX venting systems

Material

Description

Type

ASTM or ULC Specification

Pipe

Solvents/Primers

**

Cements

PVC

Pressure Pipe

Schedule 40

D1785

D2466

or

D2665

F656

D2564

DWV

Schedule 40

D1785/D2665

Cellular Core

Schedule 40

F891

SDR 26

N/A

D2241

SDR 21

N/A

D2241

IPEX

Schedule 40

ULC S636

ULC S636

ULC S636

ULC S636

Royal Pipe

Schedule 40

ULC S636

ULC S636

ULC S636

ULC S636

ABS

ABS

Schedule 40

D1527

D2468

Clear Cleaner 

For ABS†

D2235

DWV-IPS Sizes

Schedule 40

D2661

D2661

Cellular Core DWV-IPS Sizes

Schedule 40

F628

CPVC

Pressure Pipe

Schedule 40

F441

F438

F656

F493

SDR

N/A

F442

N/A

IPEX

Schedule 40

ULC S636

ULC S636

ULC S636

ULC S636

Royal Pipe

Schedule 40

ULC S636

ULC S636

ULC S636

ULC S636

*PVC and ABS pipe may use either DWV or pressure rated fittings. 

**Colored or tinted solvents or primers must be used where required by code in the USA

†ABS plastic does not require a primer before solvent cementing. A cleaner for ABS is recommended to remove any surface residue. ABS cleaners

are not subject to ASTM standards.

Polypropylene

Approved Manufacturer

Solvents Primers

Cements

Poly Pro®

M & G Dura Vent

Not Permitted

Not Permitted

NOTE:  Polypropylene  vent  systems  are  UL−1738  and  ULC  S636  listed  and  assembled  using  mechanical  fastening  systems

supplied by the vent manufacturer.

WARNING

!

CARBON MONOXIDE POISONING

Failure  to  follow  these  warnings  could  result  in  personal  injury  or

death.

The internal drain trap plug MUST BE APPLIED to the vent side of the

collector  box  trap  connection  of  the  furnace.  Failure  to  do  this  may

result in vent gases being released into the living space.

Failure  to  use  a  properly  constructed  trap(s)  or  NOT  water-priming

trap(s) before operating furnace may allow positive pressure vent gases

to  enter  the  structure  through  drain  tube.  Vent  gases  contain  carbon

monoxide which is tasteless and odorless.

Summary of Contents for KGAET0201ETK

Page 1: ...r Follow the manufacturer s instructions in the use of primer and cement and never use primer or cement beyond its expiration date The safe operation as defined by ULC S636 of the vent system is based...

Page 2: ...rainage system and possibly the living space See Fig 3 Application to Combustion Air Inlet Piping Systems This Trap Kit may used to help prevent liquid moisture from the inlet piping system from enter...

Page 3: ...be either away from trap vent side or toward trap combustion air side curve of vent tee must be positioned toward termination toward major flow of condensate except as shown in Fig 2 i When larger di...

Page 4: ...t and transition to the pipe diameter required in the vertical portion of the pipe after the tee WARNING CARBON MONOXIDE POISONING HAZARD Failure to follow these warnings could result in personal inju...

Page 5: ...d listed to ULC S636 3 Not all materials below may be approved or listed to ULC S636 4 Royal Pipe and IPEX are approved suppliers of ULC S636 pipe fittings cements and primers 5 Factory accessory conc...

Page 6: ...PLUG THESE PORTS A OPEN DOWNFLOW ORIENTATION B PLUG THESE PORTS A OPEN HORIZONTAL RIGHT ORIENTATION A OPEN B PLUG THESE PORTS HORIZONTAL LEFT ORIENTATION Representative drawing only some models may va...

Page 7: ...llations must comply with regulations of local building heating plumbing or other codes in effect in area where installation is made Complete the installation of the drainage system as follows 1 Dry f...

Page 8: ...te 7 Listen for gurgling noises in the venting and drainage systems This is an indication that there are dips in the piping system or that the traps are not operating properly Correct the conditions a...

Page 9: ...g doors and windows and all doors between the space in which the appliance s connected to the venting system are located and other spaces of the building 4 Close fireplace dampers 5 Turn on clothes dr...

Page 10: ...y in appearance H G SLOPE UP TO TERMINATION 1 4 IN PER FOOT Two inch pipe shown When another size pipe is used discard the 2 in tee in the kit and use a field supplied tee that is the same diameter as...

Page 11: ...ISTS G B A AIR FLOW H SLOPE UP TO TERMINATION 1 4 IN PER FOOT Two inch pipe shown When another size pipe is used discard the 2 in tee in the kit and use a field supplied tee that is the same diameter...

Page 12: ...PIPIING See NOTES in Figure 1 COMBUSTION AIR INLET PIPE MAY TERMINATE IN WELL VENTILATED CRAWL SPACE VENTILATED COMBUSTION AIR OR EXTERNAL TO STRUC TURE TRAP KIT MAY ALSO BE APPLIED SLOPE UP TO TERMIN...

Page 13: ...rnace L12F029 Fig 12 Combustion Air and Vent Pipe Diameter Transition Location and Elbow Configuration Representative drawing only some models may vary in appearance TO CODE APPROVED DRAIN OR CONDENSA...

Page 14: ...rrier Company Edition Date 04 20 Catalog No AG KGAET 06 Replaces AG KGBET 01 KGAET0201ETK Installation Instructions Manufacturer reserves the right to change at any time specifications and designs wit...

Reviews: