-32-
Instruction Manual
RENATRON
®
II 100 DIALYZER REPROCESSING
STATION PERFORMANCE INSPECTION SCHEDULE
3 6 9 12
Calibration Verification
Performed daily by the operator
RENATRON
®
Exterior Inspection
Performed daily by the operator
Formula 409
®
cleaning procedure
Perform this procedure every
2 weeks or as needed
Inspect all external Quick Disconnects
X X X X
for defects and/or worn O-rings
Inspect Reprocessing Connections
X X X X
Inspect RENALIN
®
100
Uptake
X X
Tubing Assembly
Inspect valve Assembly (Large, Small,
X
V15)
Inspect Hydraulic Compartment for
X
any signs of fluid leakage
Test Jet Pump Assembly
X
Inspect
RENATRON
II Scanner Gun
X
X
X
X
Inspect Barcode Labels for any
X
X
X
X
visual defects
Inspect Front Mask for Visual Defects
X
X
Test Check Valve Water Hose Assembly
X
Replace RENALOG
®
RM Backup Media
3 yrs.*
*NOTE: Replace RENALOG RM backup Media (Zip, Flash Drives, etc)
every three years or as recommended by the manufacturer.
Monthly Intervals
Inspection Description