background image

-12-

Instruction Manual

3.  "TANK VOLUME" error message appears when the internal mixing/measuring tank should be empty but is 

not or when an improper action has occurred within the tank. 

4.  "CLEAN" message appears during the dialyzer cleaning steps.

5.  "ADD CHEMICAL" error message appears when machine detects that an insufficient amount of RENALIN

® 

100 Cold Sterilant has been drawn into the mixing/measuring tank.

6.  "TEST" message appears during the dialyzer testing steps. 

7.  "VOLUME FAIL" error message appears when measured dialyzer blood compartment (priming) volume is 

less than the blood compartment reference volume.

8.  "PRESSURE FAIL" error message appears when a dialyzer fiber leak or compromised dialyzer header 

integrity has been detected by the machine. 

9.  "DISINFECT" message appears during the dialyzer disinfection steps. 

10.  "ALARM" error message flashes continuously while the machine is in alarm mode. 

11.  "PROCESS COMPLETE" message appears when dialyzer reprocessing cycle is complete. 

12.  "INTERLOCK" error message appears when the "START SANITIZE" switch has been pressed and the 

sanitize interlock is not engaged. 

13.  "SANITIZE COMPLETE" message appears when the machine sanitization cycle is complete. 

D. 

Interface Module Indicators

1.  "POWER" is the light emitting diode (LED) on the front panel. When illuminated, it indicates electrical power 

is switched on. 

2.  "SCANNER ON LINE" is the light emitting diode (LED) on the front panel. When illuminated, it indicates 

bar code scanner can be used to input data. Bar code scanner is disabled at all other times. 

NOTE – Separate manuals are provided with the computer system. Refer to the respective manuals for detailed 

information about the computer, monitor, and printer controls and indicators. 

IMPORTANT – TO ISOLATE THE STATION FROM THE ELECTRICAL SUPPLY YOU MUST DISCONNECT THE 

CORD FROM THE POWER ENTRY MODULE LOCATED IN THE LOWER RIGHT (WHEN VIEWED FROM THE 

FRONT) SIDE OF THE UNIT BACKSIDE. THE UNIT SHOULD BE SITUATED TO ALLOW AS MUCH ROOM ON 

THE RIGHT SIDE AS POSSIBLE, ALLOWING EASY ACCESS.

CAUTION

 – TOTAL SYSTEM CHASSIS RISK CURRENT SHOULD NOT EXCEED 100 MICRO AMPS.

ATTENTION

 – LE COURANT DE RISQUE TOTAL ADMISSABLE AU CHASSIS NE DOIT PAS DEPASSER 

100 MICRO AMPS.

NOTE – Report any damage promptly to the shipping company and make claim for compensation. Damage 

incurred during shipment is not covered by the machine warranty. Please save the shipping container for use 

in returning machine if repairs are necessary. 

NOTE

 – All plumbing (hoses and lines) are cut to length and calibrated at the factory and must not be modified from 

the original lengths or sizes. Only factory authorized service personnel should repair or replace these items. 

CAUTION

 – PRIOR TO CONNECTING, ALL WIRING MUST BE CHECKED TO ENSURE PROPER POLARITY 

AND ALL GROUNDS MUST BE CHECKED TO ENSURE CONTINUITY.

CAUTION

 – WHEN THE WATER SUPPLY FEED LINE IS CONNECTED TO THE RENATRON 

II 100 SERIES, IT MUST BE EQUIPPED WITH AN "ON-OFF" VALVE THAT WILL PERMIT 

SHUTTING OFF THE FLOW OF WATER TO THE RENATRON

 

II 100 SERIES WHEN NOT IN USE. 

CAUTION

 – PROPER WATER SYSTEM OPERATION MUST BE VERIFIED. SEE SPECIFICATION SECTION 

FOR WATER REQUIREMENTS.

NOTE

  –  THE  RENALIN

 

100  COLD  STERILANT  CONTAINER  IS  TRANSLUCENT  TO ALLOW  THE 

USER TO VIEW THE LEVEL OF SOLUTION. ALWAYS USE THE RENALIN 100 COLD STERILANT 

CONTAINER AS A SUPPLY TANK FOR THE RENATRON II 100 SERIES. DO NOT USE ANY OTHER 

TYPE TANK OR CONTAINER. 

RENATRON

®

 II 

100 Installation 

Instructions

Summary of Contents for MEDIVATORS renatron II 100 Series

Page 1: ...100 Series Dialyzer Reprocessing System INSTRUCTION MANUAL MODEL RS 8330 RS 8335 100 Series...

Page 2: ...IN PERASSAY ACTRIL and ON DEMAND are registered trademarks of Medivators Inc Formula 409 is a registered trademark of the Clorox Company 50096 725 Rev D 2015 Medivators Inc Printed and Assembled in th...

Page 3: ...tions 12 8 Computer Installation Instructions 16 9 Daily Machine Sanitize Procedure 17 10 Operating Procedures 17 11 Bar Code Scanner Procedures 23 12 Storage and Handling for Reprocessed Dialyzers 24...

Page 4: ...and delivery of proportioned RENALIN 100 Cold Sterilant solution to hollow fiber dialyzers It is also indicated for record keeping of these functions The RENATRON II 100 Series system is indicated fo...

Page 5: ...TION THE OPERATOR SHOULD BE FAMILIAR WITH THE SAFE HANDLING TECHNIQUES FOR THE MACHINE AND THE RENALIN 100 COLD STERILANT AND WITH THE RECOMMENDED FIRSTAID PROCEDURES IN CASE OF CONTACT WITH OR EXPOSU...

Page 6: ...tem for rinsing cleaning and testing of hollow fiber dialyzers and for delivery of Proportioned RENALIN 100 Cold Sterilant solution to the dialyzers The RENATRON II 100 Series System can also perform...

Page 7: ...dialyzer measured priming volume may differ from advertised volume by as much as 20 It is recommended that the operator measure new dialyzer volume with a known calibrated RENATRONII 100 Series to det...

Page 8: ...nstruction Acrylic PVC ABS Polypropylene Delrin Ethylene Propylene Viton Rubber Stainless Steel B Electrical Leakage Current risk current Each RENATRON II 100 Series is allowed a leakage current less...

Page 9: ...3 cm Weight 3 2 lbs 1 5 kg 4 Report Printer approximately Width 17 7 inches 50 cm Depth 14 6 inches 37 cm Height 5 7 inches 15 cm Weight 11 7 lbs 5 3 kg 5 Monitor LCD approximately Width 14 8 inches 3...

Page 10: ...e RENATRON station will perform a header leak test between program Step 2 and 3 If a Pressure Fail message appears in Step H 2 verify that the blood port connections are secure and that the dialyzer h...

Page 11: ...display to SEL Reset must be used at the end of a cycle or in an alarm state locked out or disabled at all other times to guarantee automatic transfer of reprocessing data to the computer 7 DISPLAY sw...

Page 12: ...er to the respective manuals for detailed information about the computer monitor and printer controls and indicators IMPORTANT TO ISOLATE THE STATION FROM THE ELECTRICAL SUPPLY YOU MUST DISCONNECT THE...

Page 13: ...13 Instruction Manual Figure 1 RS 8335...

Page 14: ...14 Instruction Manual Figure 2 RS 8330...

Page 15: ...he water pressure gauge block to the back of the drip tray using the screws provided Be absolutely certain that no water leaks exist and all connections are secure G Connect the dialysate line quick d...

Page 16: ...the computer manufacturer s manual for instructions for connecting the monitor keyboard and mouse G Power on sequence of computer system 1 Printer s 2 Monitor 3 Computer 4 Interface module 5 RENATRON...

Page 17: ...UP THE RENALOG RM PROGRAM BEFORE NORMAL ONLINE USE OF THE SYSTEM IS ATTEMPTED THERE IS A SEPARATE RENALOG RM INSTRUCTION MANUAL P N 50090 859 A General Considerations and Cautions CAUTION MEDIVATORS S...

Page 18: ...100 SERIES COMM PORT 2 RENATRON II 100 SERIES COMM PORT 5 RENATRON II 100 SERIES COMM PORT 3 RENATRON II 100 SERIES COMM PORT 6 RENATRON II 100 SERIES COMM PORT Port 6 Port 5 Port 4 SCANNER Port 3 Por...

Page 19: ...rocessing Management System follow the calibration procedure outlined in the RENALOG RM User Guide PN 50090 859 C Remove the Dialyzer from the Extracorporeal Blood Circuit using standard facility prot...

Page 20: ...screen of the RENALOG RM Program when the green light is illuminated on interface module scan the bar code label on the dialyzer to be reprocessed scan the bar code label on the RENATRON II 100 Serie...

Page 21: ...e a supply of disinfected port caps Disinfection of the dialysate port caps blood port caps and the reprocessing connectors from the dialyzer can be achieved by one of the following ways a Place the c...

Page 22: ...ble waterproof or permanent ink or other indelible marking systems to label the dialyzer is recommended when the RENATRON II 100 Series station is operated without RENALOG RM In the automaticmode thei...

Page 23: ...bar code and the gun should be held 6 to 9 inches from the bar code 2 With a straight vertical motion move the scanner down over the label so that the red beam passes over the bar code The illustratio...

Page 24: ...TION EXPOSING DIALYZERS TO CYCLIC TEMPERATURE DIFFERENCES DURING ANY PART OF THE REUSE PROCEDURE MAY RESULT IN INCREASING OR INITIATING PRESSURE BUILDUP IN THE DIALYZER DURING STORAGE IN THESE CONDITI...

Page 25: ...ss ON switch SEL and will be displayed 4 Press and hold the SETUP switch S3 on the microprocessor board for 4 seconds until you hear the second chirp The PROGRAM STEP will display c1 and CAL will be d...

Page 26: ...inue operating until it enters PROGRAM STEP 14 23 Press the OFF switch 24 Verify that the liquid level in the tank is at the 507 reference line upper tank scribe line 25 If the liquid level is above o...

Page 27: ...TS DO NOT USE BLEACH C Formula 409 Service Cleaning Procedure The internal fluid pathways must be cleaned periodically typically once every two weeks or as required as outlined below RENATRONII100Seri...

Page 28: ...ess the OFF switch and turn the water supply to the machine off Leave the machine overnight Wait at least 8 hours 14 Remove the uptake tube from the container of Formula 409 and make sure any excess F...

Page 29: ...e hose and replaces it with Formula 409 9 Press ON select program 00 press the START SANITIZE switch Allow the machine to continue operating to the SANITIZE COMPLETE message in PROGRAM STEP 83 10 Pres...

Page 30: ...t a sample from the calibration cell for a culture of water from the RENATRON station b After the sample has been collected press the RESET switch The RENATRON II 100 Series Station is now ready for c...

Page 31: ...ATORS Renal Technical Support for the appropriate packing and shipping instructions Do not ship any part of the RENATRON II 100 Series system to MEDIVATORS without first notifying the Renal Technical...

Page 32: ...Inspect Reprocessing Connections X X X X Inspect RENALIN 100 Uptake X X Tubing Assembly Inspect valve Assembly Large Small X V15 Inspect Hydraulic Compartment for X any signs of fluid leakage Test Jet...

Page 33: ...ive Products or any parts it deems defective or ii a refund of the purchase price This will be customer s exclusive remedy for a covered defect In order to recover under the warranty the customer must...

Page 34: ...Fuse Location Note Parts service and a service manual with drawings parts lists circuit diagrams are available on request from MEDIVATORS Renal Technical Support Explanation for Symbols Technical Supp...

Page 35: ...ing Management Software 78398 192 RENALIN Residual Test Strips 78198 000 PERASSAY 500 Peracetic Acid Test Strips 78378 000 Dialyzer Dialysate Port Caps Red 78196 010 100 Ventable Dialyzer Dialysate Po...

Page 36: ...729 Medivators BV Sourethweg 11 6422PC Heerlen The Netherlands Tel 31 45 5 471 471 Cantel Medical Asia Pacific Pte Ltd 1A International Business Park 05 01 Singapore 609933 Tel 65 6227 9698 Cantel Med...

Reviews: