-15-
Instruction Manual
CAUTION
– ALWAYS STORE THE RENALIN
®
100 COLD STERILANT CONTAINER UPRIGHT AND OUT OF
DIRECT SUNLIGHT. EXPOSURE TO DIRECT SUNLIGHT DAMAGES THE CLEANING AND DISINFECTING
QUALITIES OF THE RENALIN
100 COLD STERILANT.
NOTE -
STORING RENALIN 100 COLD STERILANT IN ITS ORIGINAL SHIPPING CARTON PREVENTS
EXPOSURE TO SUNLIGHT.
A.
Verify suitable service connection
1. Water quality must meet or exceed water requirements listed in Section 5 specifications.
2. If static (no flow) water pressure exceeds 55 psig (379K Pa, 3.79 Bars) make sure the static pressure is reduced
to below 55 psig. Dynamic pressure displayed must be 20 psig or greater in step
04
. Optimal dynamic water
pressure is between 30-35 psig.
B.
Remove the machine from shipping carton
and inspect for possible damage incurred during shipment. Lift the
machine by placing fingers under the rear corners of the station, pulling the station close to the body, and lifting
while keeping the back straight. Keep the station close to the body while carrying to the new location.
C.
Remove Hose Connection Assembly, Instruction Manual and Calibrated Volume Cell
. Save carton for
future use in service or evaluation return.
D.
Remove drip tray(s) from shipping carton(s) and place in desired location on sturdy
, level bench. Place the
machines in appropriate mounts on the drip tray. The RENATRON
®
II 100 Series Station must be level. Machines
that are not level may have a 0-8 ml error in the initial volume that is displayed when measuring Calibrated Volume
Cell.
E.
Place the uptake tube marked with the word RENALIN 100 in a container of RENALIN 100
.
F.
Make service connections to power, water and drain in accordance with Specifications listed in Section 5
.
Make sure that the water pressure gauge block is connected between the water inlet source and the RENATRON
II 100 Series Station. Secure the water pressure gauge block to the back of the drip tray using the screws provided.
Be absolutely certain that no water leaks exist and all connections are secure.
G.
Connect the dialysate line quick disconnects together
using the plastic male to male connector (interlock
connector).
H.
Open the water supply valve completely
.
I.
Push the switch labeled "ON
." "SEL" will be displayed in the "VOLUME" display and "--" will appear in the
"PROGRAM STEP" display window.
J.
Push the "MUTE ALARM" switch and the "RESET" switch at same time
. "00" will be displayed in the
"PROGRAM STEP" display window.
K.
Touch and hold the "HOLD TO SET" switch and adjust the "SET" knob until the "VOLUME" window
displays (003). Release the "HOLD TO SET" switch.
L.
Press the "START PROCESS" switch
. The machine will finish the process cycle and then the "PROCESS
COMPLETE" message and tone will be activated.
M. The calibration cell volume should be within ± 3 cc. of the volume value displayed on the RENATRON II 100
Series Station. If the value is not within this range, refer to Sections 14.
N.
Press the "RESET" switch
. The "VOLUME" display will read "SEL" and the "PROGRAM STEP" display will
indicate "00" or the last program mode used.
O.
Press the "START SANITIZE" switch
. A amber light will appear in corner of switch. Ensure that the machine
completes all sanitize steps and stops at step
83
. After the "START PROCESS" switch is pressed, the machine
should complete the cycle after approximately seventeen (17) minutes. Steps higher than
83
are used only when a
complete hydraulic purge is needed (e.g. preparation for shipment).
P. Installation is complete.
Repeat for each RENATRON II 100 Series station
.
Q. Reference the following section for Computer System installation instructions.
CAUTION
– RENATRON II 100 SERIES STATIONS ARE NOT SANITIZED AT THE FACTORY. THE SANITIZE
PROCEDURE MUST BE PERFORMED PRIOR TO REPROCESSING DIALYZERS INTENDED FOR PATIENT
USE.
A.
Remove the computer system from shipping cartons
and inspect for possible damage incurred during
shipment. Save carton for future use in service or evaluation return.