17.3
Installation place provision
Concrete Foundation
1
Foundation could be on
fl
at and is
recommended be 100-300 mm higher than ground
level.
2
Install a drainage around foundation for smooth
drain
3
When installing the outdoor unit
fi
x the unit by
anchor bolts of M10.
4
When installing the unit on a roof or a veranda,
drain water sometimes turns to ice on a cold morning.
Therefore, avoid draining in an area that people often
use because it is slippery.
*
Space for downward piping space
Nº
Description
1
Outdoor Unit
2
3
Mortar Hole (Ø100xDepth 150)
4
Anchor Bolt M10 (Ø12.5 Hole)
5
Drainage (Wide 100xDepth 150)
6
Drainage
7
Vibration-proof rubber
N O T E
When the mark * dimension is secured, piping work
from bottom side is easy without interference of
foundation.
5
The whole of the base of the outdoor unit
should be installed on a foundation. When using
vibration-proof mat, it should also be positioned the
same way. When installing the outdoor unit on a
fi
eld
supplied frame, use metal plates to adjust the frame
width for stable installation as shown in below
fi
gure.