www.canovate.com
l
l
P. +90 216 484 2222
Can BREE
ZE
Operating and Maintenance Cooling Unit Instructions 8-14 kW
l
29
17. UNIT INSTALLATION
17.1
OUTDOOR UNIT INSTALLATION
CAUTION
Transport the products as close to the installation
location as practical before unpacking.
Do not put any material on the products.
Apply four lifting wires on to the outdoor, when lifting
it by crane
CAUTION
•
Install the outdoor unit with suf
fi
cient clearance
around it for operation and maintenance as shown in
the next
fi
gures. Install the outdoor unit where good
ventilation is available
•
Do not install the outdoor unit where is a high
level of oil mist, salty air or sulphurous atmosphere.
•
Install the outdoor unit as far as practical (being
at least 3 meters) from electromagnetic wave radiator
(such as medical equipment).
•
For cleaning, use nonin
fl
ammable and
nontoxic cleaning liq- uid. Use of in
fl
ammable agent
may cause explosion or
fi
re.
•
Work with suf
fi
cient ventilation, for working in
an enclosed space may cause oxygen de
fi
ciency.
Toxic gas may be pro- duced when cleaning agent is
heated to high temperature by, e.g., being exposed to
fi
re.
•
Cleaning liquid shall be collected after cleaning.
•
Pay attention not to clamp cables when
attaching the service cover to avoid electric shock or
fi
re.
C A U T I O N
Keep clearance between the units of more than
100mm, and avoid obstacles that may hamper air
intake, when installing more than one units together.
Install the outdoor unit in the shade or not exposed
to direct sun- shine or direct radiation from high
temperature heat source.
Do not install the Outdoor Unit in a space where a
seasonal wind directly blows to the Outdoor fan.
Check to ensure that the foundation is
fl
at, level and
suf
fi
ciently strong.
Install the unit in a restricted area not accessible by
the general public Aluminium
fi
ns have very sharp
edges. Pay attention to the
fi
ns to avoid injury