![Canon OMNERA 400T Operator'S Manual Download Page 125](http://html.mh-extra.com/html/canon/omnera-400t/omnera-400t_operators-manual_61479125.webp)
Operator´s Manual
0180-095-418-EN Rev. 6.1
OMNERA®
2020-09-18
Page 117
4.6 Synchronization control/tracking
The automatic tracking is activated at the display.
Activation of the synchronization button will drive the OTC to the position for tracking.
The activation will lead to a synchronization and tracking between the tube holder and the
detector.
Fig. 4-27 Synchronization button with indication light — display
The synchronization button at the display, also comprises a yellow indication light. This light
indicates if there is an alignment.
• Permanent yellow light — indicates;
Alignment
.
• Flashing yellow light — indicates;
No alignment
.
Summary of Contents for OMNERA 400T
Page 1: ...Technical Publication Operator s Manual 0180 095 418 EN Rev 6 1 ...
Page 3: ...Rev Date New release 6 1 2020 09 ...
Page 4: ......
Page 8: ...Contents OMNERA 0180 095 418 EN Rev 6 1 Operator s Manual Page iv 2020 09 18 ...
Page 148: ...OMNERA 0180 095 418 EN Rev 6 1 Operator s Manual Page 140 2020 09 18 Waste disposal ...
Page 165: ...Operator s Manual 0180 095 418 EN Rev 6 1 OMNERA 2020 09 18 Page 157 Appendix B Annual Checks ...
Page 166: ......