ELURA20 MC A, ELURA10 A
CAHPTER 3. INFORMATION FOR REPAIR · SERVICE HINTS
3-2
2. Settings
Perform the AF/EIS/ CAMERA adjustments in a complete-product state.
2-1 Recorder Adjustment Setting
<Purpose>
Check of each section, tape path adjustment, and recorder electrical adjustment are made with the front, rear, left and right cover
units removed.
2-1-1 Setting
<Procedures>
1)
Solder the jumper wires (
×
2), TP2001 (PB-RF) and TP2002 (SWP) on the MAIN P.C.B.
2)
Connect the cable of the Right Cover unit with the CN102 (R-KEY) and CN3201 (power supply).
3)
To turn on the power, connect the cable of the Left Cover unit with the CN200 (P-DIAL).
*Connecting the TP203 and TP204 (MAIN P.C.B.) to ground can trun on the power also.
4)
Operation by a LANC Remote Controller is possible by connecting the Docking Unit (DU-300) with the Multi Connector.
5)
The power is suppliable via the DC-400 or connecting the Constant Voltage Supplier with the TP3201/3202 (DC+) and the TP3203/
3204 (DC-).
LANC REMOTE
COMMANDER
RM-95
A/V JACK
R
L
V
CN102
CN200
CN3201
DC-400
Right Cover Unit
Battery
Treminal
A/V JACK
MONITOR TV
Docking Unit
(DU-300)
Right
Cover Unit
Left Cover Unit
TP202
(CAM PW SW)
CN1401
IC1302
IC2000
IC3201
TP204
(VTR PW
SW2)
TP203
(VTR PW SW1)
TP2002
(SWP)
TP2001
(PB-RF)
TP3203
(DC
+
)
TP3204
(DC
+
)
TP3202
(DC
−
)
TP3201
(DC
−
)
FU3201
FU3202
MAIN P.C.B.
Fig. 3-1
Summary of Contents for ELURA10 A
Page 150: ...5 16 ELURA20 MC A ELURA10 A CVF Unit Section 15 14 9 8 13 12 11 6 5 1 2 3 4 7 16 17 10 ...
Page 152: ...5 18 DMC II Mechanical Chassis Section 1 1 4 2 3 6 7 10 11 12 5 4 2 3 8 9 Slide Chassis Ass y ...
Page 158: ...5 24 DMC II Mechanical Chassis Section 4 REAR FACE 1 2 2 5 6 7 8 9 5 10 11 12 1 13 14 3 4 ...