1. Pre-Operation
1. Pre-Operation
1-2
1章
運転準備
1
.
P
r
e
-
O
p
e
r
a
t
i
o
n
1
.
P
r
e
-
O
p
e
r
a
t
i
o
n
ON0001
OM0001
Explanation on screen display after switching ON machine’s MAIN POWER. These screen displays
explain touch panel button used when operating the machine.
The screen displays are explained as sequential order below.
1.1
Screen display after MAIN POWER ON is switched ON
1.
BESTEM logo display
During auto start up, operating system will be
started automatically and the BESTEM logo
will be displayed.
Do not touch any touch button when doing steps 1 ~ 3.
2.
System loading display
System will be downloaded.
3.
System loading completed
After system loading is completed, the screen will
change to [1.2 All origin return screen] display.
* Although this document shows Japanese buttons, language (English or Japanese) can be selected by
parameter.
D isplay sequence
Caution