29
This box connects and relays control signals between the X-ray generator, the image-
capture computer, the Docking Station and other equipment. The battery pack attached
to the detector is also charged while the wiring cable (sold separately, optional) is
connected to the detector (charging time: approx. 120 minutes).
This unit synchronizes the timing of X-ray irradiation with the detector’s capture. No
operation is required for this unit while using the system.
* Required specifications for a cable connected at installation by a service engineer are as follows:
• The X-ray interface cable must be connected to the secondary circuit of an X-ray generator that is
compliant with IEC 60601-1, and that circuit must be isolated from commercial power.
The input/output values for the X-ray generator’s communication circuit must not fall outside the
specification range as indicated below:
Signal input part (SIP):
Max. voltage:
5 V DC
Signal output part (SOP):
Max. voltage:
250 V AC/30 V DC
Current range:
10 mA to 2 A
• The X-ray interface box and X-ray generator must be grounded to a common protective earth.
3.2
Multi Box
3.3
X-ray interface unit
A
Ground terminal
Accepts the ground.
B
X-ray interface cable
Connects* to the X-ray generator.
C
LAN cable connector
Accepts the LAN cable.
D
DC IN jack
Accepts the power cord of the dedicated AC
adapter.
E
POWER lamp
Indicates the power status of the X-ray interface box.
B
C
D
E
A
000_DIA-2019-019-E03_AX-C4343W.book Page 29 Friday, November 27, 2020 12:38 PM
Summary of Contents for AX-C4343W
Page 6: ...Conventions 6 000_DIA 2019 019 E03_AX C4343W book Page 6 Friday November 27 2020 12 38 PM ...
Page 51: ...7 Maintenance 000_DIA 2019 019 E03_AX C4343W book Page 51 Friday November 27 2020 12 38 PM ...
Page 53: ...8 Specifications 000_DIA 2019 019 E03_AX C4343W book Page 53 Friday November 27 2020 12 38 PM ...
Page 85: ...000_DIA 2019 019 E03_AX C4343W book Page 85 Friday November 27 2020 12 38 PM ...