14
CT-2000 Instruction Manual
Figure 14: CT-2000 Electrical Connections
•
PREHEAT
cable to PREHEAT socket
•
CONTROL HEATER
cable to CONTROL HEATER socket
•
FAN
cable to FAN socket
•
MOTOR STIRRER
cable to MOTOR socket
•
CONTROL PROBE
cable to CONTROL PROBE socket
•
OVER TEMP
cable to OVER TEMP socket
•
LEVEL FLOAT CABLE
to LEVEL FLOAT socket
18.
Reattach the top heater housing, ensuring that the heater, motor, and fan cords pass through
the left side opening (as viewed from the rear) and that the control probe, over-temperature
probe, and level switch cords exit from the right side opening (also viewed from the rear). The
back lip on the rear top cover fits into the slot on the top heater housing. Line up the holes,
insert screws, and tighten.
19.
Adjust the four leveling feet on the bottom of the bath housing to level the bath jar. This
adjustment must be done prior to filling the bath with fluid.
20.
Plug the CT-2000 main power cord at the back of the electronics drawer into an outlet with
electrical specifications matching the label on the rear of the instrument.
Control Probe
Level Float Cable
Over-Temp
Control Heater
PreHeat Cable