
CANNON Instrument Company | Unpack & Assemble
9
4.
Inspect each component for signs of damage. Report any damages to the shipper and to Cannon
Instrument Company immediately.
Figure 4: Unpacked Primary Bath Components
Damaged Items
Retain all packing materials until the instrument is connected and functioning properly. If any
component(s) must be returned to CANNON, the damaged item(s) should be packaged in the
original shipping container. Refer to the
section of this manual for instructions on
returning defective equipment. Customers outside the United States should contact their local
CANNON agent for procedures on returning products to Cannon Instrument Company.
Assembly Procedure
1.
Unpack the bath unit housing and move it to its permanent location on a stable laboratory
bench or table.
2.
Remove the eight screws from the stainless steel top covers. Refer to Figure 5 and Figure 6.
Figure 5: Detaching Top Cover
Figure 6: Remove Screws from Top Covers
Remove all screws
Summary of Contents for CT-2000
Page 1: ...Instruction Operation Manual CT 2000 Constant Temperature Bath 27 9991 ...
Page 2: ......
Page 4: ......
Page 53: ......