![Cambium Networks PMP 450 AP Planning And Installation Manual Download Page 268](http://html1.mh-extra.com/html/cambium-networks/pmp-450-ap/pmp-450-ap_planning-and-installation-manual_3055234268.webp)
Chapter 5: Installation
Installing an integrated ODU
Page
57
2
Attach the bottom bracket to the ODU using (2) hex bolts
and secure the M8 bolts by applying 5 Nm torque.
3
Attach the top bracket to the projecting studs on the ODU
and secure the top bracket using two M8 nuts by applying
5 Nm torque.
4
Fix the front and rear strap assembly to the upper bracket
using two bolts. Do not tighten the nuts now.
Note
The PMP 450m antenna operates with 2
degrees of electrical down-tilt.