background image

SATK20 & SATK30

4

Technical Specification - SATK20

Medium:

Water

Max. percentage of glycol

30%

Max. temperature:

85˚C

Max. working pressure:

Primary circuit:

10 bar 

Domestic hot water:

10 bar

Nom. DHW heat exchanger net output:

50 kW

Max. recommended primary circuit flow rate:

1.2 m³/h

DHW circuit max. flow rate:

18 l/m (0.3 l/s)

Min.flow rate to activate domestic flow sensor:

2.7 l/m ±0.3

Max. differential pressure on domestic
water modulating valve:

∆p 0.9 bar

Max. differential pressure on mixing valve:

∆p 0.9 bar

Power supply:

230 V (ac)±10% 50 Hz

Power consumption:

105 W (SATK 20203)

Protection class:

IP 40

Pump:

UPS 15/60

Pump bypass setting:

0.45 bar

Actuator:

stepper 24 V

Probes:

NTC 10 kΩ

Safety thermostat:

55˚C ±3

Technical Specification - SATK30

Medium:

Water

Max. percentage of glycol

30%

Max. temperature:

85˚C

Max. working pressure:

Primary circuit:

16 bar

Secondary circuit:

3 bar 

Domestic hot water:

10 bar

Nom. heating exchanger net output:

15 kW

Nom. DHW heat exchanger net output:

SATK30103:

50 kW

SATK30105:

75 kW

Max. recommended primary circuit flow rate:

1.2 m³/h

DHW circuit max. flow rate:

18 l/m (0.3 l/s)

Min.flow rate to activate domestic flow sensor:

2.7 l/m ±0.3

Max. differential pressure on domestic
water modulating valve:

∆p 0.9 bar

Power supply:

230 V (ac)±10% 50 Hz

Power consumption:

105 W

Protection class:

IP 40

Pump:

UPS 15/60

Pump bypass setting:

0.45 bar

Actuator:

stepper 24 V

Probes:

NTC 10 kΩ

Safety relief valve setting:

3 bar

Safety thermostat:

55˚C ±3

Expansion vessel:

7.5 litre

Pressure switch:

opening 0.4 bar - closing 0.8 bar

Material

Components:

brass BS EN 12165 CW617N

Pipes:

stainless steel

Frame:

RAL 9010 sprayed steel

Protective shell cover:

PPE

Exchanger:

brazed stainless steel

Installation

The SATK series HIUs are designed for installation in a sheltered
domestic environment (or similar), therefore cannot be
installed or used outdoors, i.e. in areas directly exposed to
atmospheric agents. Outdoor installation may cause
malfunctioning and hazards.

If the device is enclosed inside or between cabinets, sufficient
space must be provided for routine maintenance procedures. It
is recommended that electrical devices are NOT placed
underneath the HIU, as they may be damaged in the event of
discharge from the safety valve, if it is not connected to a
discharge tundish (SATK30103 and SATK30105), or in the event
of leaks occurring at the hydraulic fittings.

If this advice is not heeded, the manufacturer cannot be held
responsible for any resulting damage.

In the event of a malfunction, fault or incorrect operation, the
device should be deactivated; contact a qualified technician for
assistance.

NOTE for all models:

If a non-return valve is fitted into the domestic hot water
(DHW) cold water inlet, provision MUST be made to
accommodate the expansion of the DHW contained within the
HIU.

Preparation

After establishing the position where the HIU will be installed,
perform the following operations:

Mark the holes required for securing the HIU to the wall.

Mark the position of the water pipe connections.

Check the measurements again before installing pipework and
electrical cables.

Hydraulic connections:

1

connection to the pipework from the centralised boiler 
plant

2

heating circuit connection

3

domestic water circuit connection

4

discharge from safety relief valve

Electrical:

1

electric supply line 230 V (ac) – 50 Hz

2

time clock/thermostat line (potential-free)

3

centralised bus line for heat meter data transmission (if 
required)

4

centralised electric supply line for heat meter (if required)

Summary of Contents for Altecnic SATK20

Page 1: ...SATK20 SATK30 heat interface unit Installation Operation Maintenance Instructions...

Page 2: ...roduct range 1 Safety instructions 1 Dimensions and technical speci cation 3 Installation 4 First operation 5 Electronic controller 6 Safety and alarms 7 SATK20103 and SATK20203 components 8 SATK20303...

Page 3: ...e operation of the device and or system NOTE Risk of electric shock Live parts Shut off the electric supply before opening the HIU cover 1 During installation and maintenance operations always avoid d...

Page 4: ...Dimensions SATK30 A B C kg G B G B G B 16 A B C kg G B G B G B 19 550 A A B B 65 65 450 C C 59 101 160 65 190 195 430 15 490 46 10 245 110 265 110 85 A A B B 629 65 65 550 C C 159 101 160 65 290 195 5...

Page 5: ...changer brazed stainless steel Installation The SATK series HIUs are designed for installation in a sheltered domestic environment or similar therefore cannot be installed or used outdoors i e in area...

Page 6: ...ent Connection to the main supply The device is supplied with an electric supply cable plug not supplied The device should be electrically connected to a 230 V ac single phase earth mains supply using...

Page 7: ...e cover close the isolating valves empty the HIU using the drain cocks provided remove the spacer piece A remove the blanking plug B install the ow probe in the 1 4 pocket B provided install the ow me...

Page 8: ...vated the circulation pump shuts down and the and the regulating valve closes Heating cycle activation is indicated by a ashing fault LED on the electronic controller This fault does not affect the ge...

Page 9: ...d Safety valve fault Error code 76 SATK20103 LOW temperature Removing a fault Normal operating conditions are restored automatically once the faulty safety valve is working correctly again Safety sett...

Page 10: ...tic water preheating function Heating cycle modulating temperature regulation with compensated set point floor slab heating function Factory settings Components SATK20203 MEDIUM Temperature HIU Item C...

Page 11: ...ds the drying of the under oor heating screed at low temperatures This function can only be activated and executed if there are no faults It can be activated by pressing and holding the RESET button f...

Page 12: ...al load under control The thermal response time of the system is thus minimised Safety and alarms Error codes associated with faults signalled by the lighting up of the FAULT LED are also shown on the...

Page 13: ...The function is enabled by setting dip switch 5 to the ON position During periods when the domestic water cycle is not used if the DHW probe detects a temperature 10 C below the SET value the control...

Page 14: ...eturn temperature sensor 22 Pressure gauge 23 Filling loop isolation valve 24 Filling loop double check valve 25 Filling loop Not shown on Components illustration Functional characteristics SATK30103...

Page 15: ...rying of the under oor heating screed at low temperatures This function can only be activated and executed if there are no faults It can be activated by pressing and holding the RESET button for 8 sec...

Page 16: ...l maintenance procedures should be carried out by an authorised technician Regular maintenance guarantees better ef ciency and helps to save energy Before carrying out any maintenance repair or part r...

Page 17: ...the new probe Reconnect the connector respecting the only possible way it can be inserted When carrying out maintenance on the electrical system for the connections follow the diagram on page 16 Afte...

Page 18: ...HW production valve actuator x x x x Thermal safety relief valve x x Thermal safety thermostat x x Heating flow temperature probe x x x x x x x x x x x x x x x Electric supply 230 V ac x x x x x x x x...

Page 19: ...artly clogged call quali ed personnel to have it serviced modulating valve actuator faulty call quali ed personnel to have it replaced valve obturator blocked in intermediate position call quali ed pe...

Page 20: ...valves terminals closed open the valves centralised system temperature insuf cient contact person in charge of system electronic controller not working call quali ed personnel to have it replaced prim...

Reviews: