ENCORE VENTI Rev. 3 2021-10
79
www.cafection.com 800-561-6162
SERVICE & INSTALLATION MANUAL for Cafection's Encore Venti
9.4
Main board
Like any electronic main board, the one in this brewer is very sensitive to power surges inside
buildings. If an issue persists after changing the main board, verify the power source. Use the
necessary precautions for handling static sensitive devices.
Removing
1. Turn off the machine and unplug it from the outlet.
2. Open the door and remove the protection panel (inside the door) by unscrewing the four (4)
screws.
3. Unplug the connections on the main board (clockwise from the top left corner):
J11, Expansion #2, J18, J27, J12, J19, J6, J3, J14, J22
4. Unscrew the four (4) plastic 1" posts and the two screws keeping the main board in place.
5. Remove the board.
Reinstalling
1. Reinstall the board and fasten it with the four (4)
plastic 1" posts and the two screws.
2. Plug the connections (refer to the board diagram
in section 3.6 for a full-size view).
3. Verify that all connections are in place. The
board will fail if the connections are reversed or
in the wrong place.
4. Reinstall all parts in reverse order. Reinstall the
protection panel with the four (4) screws.
5. Plug in the brewer and turn it on.
6. Verify that everything all is functioning on the screen.
All cables must be replaced in the correct order and direction before turning the
power on, or the board will fail and be damaged.
P
a
rt
s Ma
in
te
na
nc
e