ENCORE VENTI Rev. 3 2021-10
71
www.cafection.com 800-561-6162
SERVICE & INSTALLATION MANUAL for Cafection's Encore Venti
P
re
v
e
n
tiv
e Ma
in
te
na
nc
e
8.2
Brew Group Assembly
Preventive maintenance: yearly or every 25,000 coffee cycles
The brew group is the heart of the equipment and is responsible for the taste of every cup. It needs
to be serviced regularly to maintain the quality of the beverages served.
Cafection offers a Brew Group Exchange Program. This program ensures a constant running of
the machine by receiving a replacement brew group to use while maintenance is performed on
the actual brew group of the unit. Cafection will completely clean and replace all parts requiring
maintenance, including the screen and seal, the cylinder and the piston seal.
The cleaned brew group will be returned with a one (1) year warranty on defective parts.
Contact [email protected] or 800-561-6162, ext. 311, to order parts or for
additional information.
Inspection
Frequency: monthly
The following are signs that the coffee extraction is not being performed adequately and that the
brew group may require preventive maintenance:
- Seal is damaged.
- Air gets into the cylinder from
around the piston seal and creates
bubbles in the coffee.
- There are coffee grounds in the
coffee dispensed.
- Spent coffee grounds remain wet
on the filter paper.
Screen and seal
Cylinder
Piston seal
Brew chamber