- 5 -
pipe on the back of the equipment upwards and outwards to the ventilation duct opening.
Power connection
Power requirements: 380V three-phase four-wire system with working zero line.
Connection of cooling water pipes
Figure 1
As shown in Figure 1, the chiller’s inlet is connected to the outlet of the analyzer, and the chiller’s
outlet is connected to the water inlet of the analyzer.
Solvent requirements
This equipment can only use neutral and stable trichloroethylene solvent with a boiling point of 87°C.
If the trichloroethylene is acidic, it must be replaced, otherwise the equipment will be damaged due
to corrosion!
Storage, transportation and moving
Storage
The equipment must be stored in the original packaging and in a closed environment, with a
minimum temperature of -15°C, a maximum of 60°C, and a maximum humidity of 70% from
atmospheric damage.
transportation and moving
In order to avoid irreversible damage to the equipment, move it carefully, do not turn it over, prevent
it from being rained, and do not stack it, avoid collisions and heat sources for the packaging and the
loaded goods.
Chiller water pipe interface
Analyzer water pipe interface