![BWT Perla Hybrid Installation And Operating Manual Download Page 24](http://html1.mh-extra.com/html/bwt/perla-hybrid/perla-hybrid_installation-and-operating-manual_2836817024.webp)
24
EN
Installation check 3/4: AQA Stop Sensor
►Check the connection and position of the floor
sensor (see chapter
If all criteria for correct installation are satisfied:
►
Press
CONFIRM
.
Installation check 4/4: Refilling the regenerative
►
Press lightly on the Easy Fill technology cover to
open it (see chapter
19).
►
Add up to 30 kg of regenerative (regenerative
tablets in accordance with DIN EN 973 type A) to
the regenerative container. The maximum level
of 100% on the display corresponds to a filling
level of approx. 46 cm.
Caution:
Do not fill with water!
►
Press the Easy Fill technology cover down gently
until it snaps shut.
NOTE
►
When filling the regenerative, make sure
that no dirt gets into the locking mechanism
(red circle).
►
Overfilling past the 100% mark can
result in implausible fill level values being
reported. Remove regenerative in case of
overfilling.
►
The product must not be operated with
Sanitabs or Sanisal.
►
Additional information can be found in
chapter
“11.5.3 Refilling operating materi
►
Press
CONFIRM
.
Completing the installation check
The installation check is completed successfully
when all four icons are green.
►
Press
CONTINUE
.
The start-up flushing runs in the background.
Device registration begins.