![BWT Perla Hybrid Installation And Operating Manual Download Page 23](http://html1.mh-extra.com/html/bwt/perla-hybrid/perla-hybrid_installation-and-operating-manual_2836817023.webp)
23
EN
Start screen
►
Press
CONTINUE
.
8 2
Installation check
The installation check verifies that your product is
properly connected.
►
Press
START CHECK
to begin.
Installation check 1/4: Waste water connection
according to EN1717
►
Check that the waste water hoses are connected
properly (see chapter
18).
If all criteria for correct installation are satisfied:
►
Press
INSTALLED
.
Installation check 2/4: Ports on the connection
fitting
►Ensure that the hoses for the inflow and outlet
water at the connection fitting are correctly con
-
nected (see chapter
►
Open the connection fitting by turning the
handwheel anti-clockwise until it stops. Rinsing
of the product starts.
If all criteria for correct installation are satisfied:
►
Press
INSTALLED
.