27
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
2
Burner installation
Fig. 34
Installation of the front insulation
Fig. 35
Side casing installation
2
3
4
1
2
3
1
z
Slide the front insulation (Fig. 34,
Item 1
) with its slot
) onto the front edge of the upper
support bracket.
z
Lead the burner cable (Fig. 34,
Item 3
) on top of the
thermal insulation down over the side of the boiler
block.
z
With two screws secure the burner cable and strain
relief on the lower cross tie-rod (Fig. 34,
).
2.7.3
Side and top casing
z
Hook the side casing (Fig. 35,
) with cut outs
into the slots of the upper cross support bracket
(Fig. 35,
) and push forward against the end
stop (see arrow in Fig. 35).
z
With two self-tapping screws each secure the side
walls at the bottom (Fig. 35,
).
NOTE!
To prevent the cable being damaged when
opening the burner door, always route the
burner cable – depending on the handing
of the burner door – on the hinge side of
the door.