37
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
2
Burner installation
3.5
Commissioning report
GE315 boilers can be operated with an oil or a gas
burner. During commissioning, carefully complete the
commissioning report for either the oil or gas burner.
z
Sign all commissioning work as completed and enter
the relevant date.
Commissioning work
Page
(individual steps)
Comments
(signature)
1.
Fill the heating system with water
2.
Vent the heating system via radiators and air vents
3.
Leak test carried out? (only for boilers supplied in
sections)
4.
Check the location of the hot gas baffle plates
5.
Commission the control device
6.
Start up the burner
See burner documentation
7.
Check the flue gas temperature
8.
Inform the system user and hand over all relevant
technical documentation
9.
Confirm professional commissioning
company stamp/signature/date
USER NOTE
z
Enter the fuel to be used into the table
(see operating instructions "Preamble",
page 2).