47
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
6
Maintenance
Demand-dependent maintenance work
Page
(individual steps)
Comments
1.
System shutdown
2.
Remove and clean the hot gas baffle plates
3.
Clean the hot gas flues (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the flue gas collector
6.
Install the hot gas baffle plates
7.
Check and, if required, replace gaskets/packing cord on
burner and burner door
See burner documentation
8.
System start-up
9.
Final check of the maintenance work; document the
measurement and test results
See burner documentation
10.
Check the function and safety in operation
See burner documentation
Confirm the professional maintenance with signature, date and company stamp