76
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Buderus Hydronic Systems • http://www.buderus.net
Servicing
14
z
Open the gas shut-off valve (see fig. 111, pos. 2)
z
Connect the heating system to the power supply,
insert the main fuse or switch on the circuit breaker.
z
Set the main switch on the BC10 to "1" (On).
z
Also check all joints and gaskets affected by the
replacement activities while carrying out the tight-
ness test in operating conditions.
z
Set the gas/air ratio again. See Chapter 9.8.
14.26 Sight glass; replacing
z
Disconnect the heating system from the power
supply, remove the main fuse or switch off the circuit
breaker.
z
Set the main switch on the BC10 to "0" (Off).
z
Remove the casing.
z
Loosen both screws of the sight glass (see fig. 112,
pos. 1).
z
Remove the sight glass mounting plate.
z
Disassemble the sight glass inclusive of both
gaskets.
z
Assemble the new sight glass and all further parts in
reverse order of disassembly; remember to fit new
gaskets.
z
Fit the casing.
z
Connect the heating system to the power supply,
insert the main fuse or switch on the circuit breaker.
z
Set the main switch on the BC10 to "1" (On).
Fig. 111 Gas shut-off valve closed (1),
gas shut-off valve open (2)
Fig. 112 Loosening the screws of the sight glass
1