Start-up procedure
9
29
We reserve the right to make any changes due to technical modifications!
Installation and Servicing Instructions Logamax plus GB142-24/30/45/60 • Version 12/2004
Buderus Hydronic Systems • http://www.buderus.net
9.3
Filling the condensate trap
z
Make sure that you fill the condensate trap with
water. This is to prevent exhaust gases from entering
the appliance.
z
Remove the condensate trap (see fig. 26).
z
Fill with water and refit the condensate trap in reverse
order.
9.4
Venting the gas supply valve
z
Loosen the screw plug on the testing nipple for the
gas connection and venting (fig. 27, pos. 1) by two
turns and fit a hose.
z
Slowly open the gas shut-off valve.
z
Run the gas that is discharged through a water bath.
z
Close the gas shut-off valve when no more air is
released.
z
Remove the hose and tighten the screw plug again.
WARNING
There is a hot water scald potential if the BC10
is set too high.
Fig. 26
Filling water into the condensate trap
Fig. 27
Venting the gas supply conduit
1