6
1
2
3
4
A08015
DETAIL A
(914 mm)
A08005
RIGGING WEIGHTS (SMALL CABINET)
RIGGING WEIGHTS (LARGE CABINET)
Unit
024
030
036*
Unit
042*
048*
060*
lb
kg
lb
kg
lb
kg
lb
kg
lb
kg
lb
kg
Shipping
Weight
354
171
364
165
419
190
Shipping
Weight
464
210
484
220
514
233
Rigging
Weight
317
144
327
148
382
173
Rigging
Weight
427
164
447
203
477
216
* For 460 volt units, add 14 lb (6.4 kg) to the weight.
Fig. 4 -- Rigging Weights
Step 5 — Select and Install Ductwork
The design and installation of the duct system must be in
accordance with the standards of the NFPA for installation of
non--residence type air conditioning and ventilating systems,
NFPA 90A or residence--type, NFPA 90B and/or local codes and
ordinances.
Select and size ductwork, supply--air registers, and return air grilles
according to ASHRAE (American Society of Heating,
Refrigeration, and Air Conditioning Engineers) recommendations.
The unit has duct flanges on the supply-- and return--air openings
on the side of the unit.
PERSONAL INJURY HAZARD
Failure to follow this warning could result in personal
injury or death.
For vertical supply and return units, tools or parts could
drop into ductwork Install a 90 degree turn in the return
ductwork between the unit and the conditioned space. If a
90 degree elbow cannot be installed, then a grille of
sufficient strength and density should be installed to prevent
objects from falling into the conditioned space. Units with
electric heaters require 90 degree elbow in supply duct.
!
WARNING
When designing and installing ductwork, consider the following:
1. All units should have field--supplied filters or accessory
filter rack installed in the return--air side of the unit.
Recommended sizes for filters are shown in Table 1.
2. Avoid abrupt duct size increases and reductions. Abrupt
change in duct size adversely affects air performance.
IMPORTANT
: Use flexible connectors between ductwork and
unit to prevent transmission of vibration. Use suitable gaskets to
ensure weather tight and airtight seal. When electric heat is
installed, use fireproof canvas (or similar heat resistant material)
connector between ductwork and unit discharge connection. If
flexible duct is used, insert a sheet metal sleeve inside duct. Heat
resistant duct connector (or sheet metal sleeve) must extend 24--in.
(610 mm) from electric heater element.
3. Size ductwork for cooling air quantity (cfm). The minimum
air quantity for proper electric heater operation is listed in
Table 2. Heater limit switches may trip at air quantities
below those recommended.
4. Seal, insulate, and weatherproof all external ductwork. Seal,
insulate and cover with a vapor barrier all ductwork passing
through conditioned spaces. Follow latest Sheet Metal and
Air Conditioning
Contractors
National Association
(SMACNA) and Air Conditioning Contractors Association
(ACCA) minimum installation standards for residential
heating and air conditioning systems.
5. Secure all ducts to building structure. Flash, weatherproof,
and vibration--isolate duct openings in wall or roof
according to good construction practices.
607C
Summary of Contents for 607C024
Page 4: ...4 A08084 Fig 2 607C024 030 Unit Dimensions 607C...
Page 5: ...5 A08085 Fig 3 607C036 060 Unit Dimensions 607C...
Page 12: ...12 A08024 Fig 12 Wiring Schematics 208 230 1 60 607C...
Page 13: ...13 A08025 Fig 13 Wiring Schematics 208 230 3 60 607C...
Page 14: ...14 A08026 Fig 14 Wiring Diagram 460 3 60 607C...