Planning Details
68
Site Planning Information BioSpec 70/30 USR_2_V020
6.7.1
Line lengths for the MRI CryoProbe
The following additional components must be considered when planning the cable routes
when an MRI CryoProbe™ is planned to be used. See Table
1
Power supply for CRP components
2
Helium gas cylinder
3
CRP compressor
4
CRP cooling unit
5
CRP preamplifier
6
CRP temperature control unit
The following cable lengths are available:
Connection
Minimum bending
radius
Available lengths
Connection cable for electrical
distributor(*) - CRP compressor
20 cm
7 m
Connection cable for electrical
distributor - CRP cooling unit
10 cm
10 m
Helium transfer line for compressor -
CRP cooling unit
30 cm
6, 10, 20 m
Helium transfer line for CRP cooling
unit - CRP preamplifier
70 cm
3, 4, 5, 6 m
Control cable for CRP preamplifier -
CRP temperature unit
10 cm
15 m
He cylinder gas tubes
20 cm
10, 20 m
(*) installations at 60 Hz require a pre-switched transformer for connection to the electrical distributor
Summary of Contents for BioSpec 70/30 USR V2
Page 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Page 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...