Planning Details
Site Planning Information BioSpec 70/30 USR_2_V020
51
The galvanic insulation must be installed in each case to avoid ground loops or RF
couplings.
Figure 6.8: Drawing of the magnet exhaust outlet (1) and the exhaust system (2). Note that (1) is
supplied by Bruker and (2) is to be installed by the System Owner.
Position of the connection point between the magnet exhaust outlet and the
exhaust system for 70/30 USR V2
Q
Distance of the magnet exhaust outlet from the
center of the magnet dewar.
37.7 cm
D
Diameter of the magnet exhaust outlet at the
connection point.
8.4 cm
H
Height where the exhaust system provided by
System Owner has to end. Please note the
minimum height and maximum tolerance (see also
drawing) to ensure appropriate connection to the
magnet exhaust outlet.
232 + 1.2 cm
Summary of Contents for BioSpec 70/30 USR V2
Page 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Page 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...