Planning Details
Site Planning Information BioSpec 70/30 USR_2_V020
65
Figure 6.17: Overview of the external line set
1 (*)
Control cables to the operating room. Cables are routed through a cable duct (min
10 cm diameter) or on a small cable tray that the customer must provide.
2a
Scanner control line: Cable set in the shielded cabin. Cables are routed on a cable
tray assembled at ceiling height.
2b
Scanner control line: Cable set outside of the shielded cabin. Cables are routed on
a cable tray assembled at ceiling height.
3
Main connection to the central electrical distributor
4
Control line and cryogenic gas line to the magnet. Lines are routed on a cable tray
assembled at ceiling height.
(*) Alternatively, a permanently installed CAT 6 cable with sockets in the technical and
operator area can be provided by the system owner.
If no RF shielded room is used, the cable set 2a runs directly to the filter plate of the CCM
and cable set 2b is not required.
N
o.
Connection
Minimum
bending
radius
Available
lengths
1
Control line to the operating room.
10 cm
25 m
2a
Control lines between cabinets and filter plate
20 cm
6, 10, 14,
18 m
2b
Control lines between filter plate and CCM
20 cm
6, 10 m
3
Main connection between electrical distributor and all
the cabinets
20 cm
12 m
4
Control line and cryogenic gas lines
40 cm
8, 16 m
Table 6.14:
Available cable lengths of the electrical connections
Summary of Contents for BioSpec 70/30 USR V2
Page 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Page 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...