Planning Details
66
Site Planning Information BioSpec 70/30 USR_2_V020
The external cable set is run along the open cable trays assembled at ceiling height. The
customer must have the cable trays installed and completely finished before installation of an
MR system begins on site. Access for placing cables in the cable tray must be freely
available during installation of an MR system.
• Typical width: 40 cm
• minimum and maximum distance of the cable platform in front of and after the filter plate:
30 – 50 cm
• Typical installation height: 240 cm – 280 cm
• Adequate possibility to fix and relieve strain at the outlets above the cabinets and above
the CCM must be provided.
• no sharp edges, provide authorized edge protection if necessary
When determining the actual cable lengths, the course of the cable routing within the cable
trays must be fully taken into account.
Figure 6.18: Cable routing between technical room and magnet room
1
The height of the connection point of the cryogenic gas lines to the magnet
depends on the type of magnet.
2
Suspended cabin ceiling (optional), which covers the cables of the MR system in a
more elegant manner.
3
Cable trays with strain relief
4
When planning the position of the cable trays, be sure to maintain the minimum
bending radii and provide adequate opportunity for strain relief.
Summary of Contents for BioSpec 70/30 USR V2
Page 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Page 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...