Installation Schedule
26
Site Planning Information BioSpec 70/30 USR_2_V020
4.3.3
Prerequisites for Operation
The following prerequisites must be fulfilled for before the system can be put into operation:
• A contact person who can continuously be reached must be named by the MR system
owner.
• Access to the installation site must generally satisfy the local safety specifications that
apply to MR systems.
• During the installation period, it must be guaranteed that only people authorized by the
Bruker employee have access to the installation site.
• The Bruker employee needs to obtain a key allowing access the installation site. If
necessary, he must be allowed access to adjacent rooms and/or buildings and circuit
diagrams, as well as facilities and systems in the building.
• All technical specifications for the different areas must be met in full.
• All safety specifications must be met in full.
• The rooms must be clean and ready for occupancy. They must meet the specifications of
environmental conditions/pollution level at the installation site.
• All necessary house connections for installation are available and operational.
• No construction work in progress at the installation site.
• Tools and materials needed to put the system into operation are available in their entirety.
It is explicitly pointed out that non-fulfillment of the technical and/or relevant safety
specifications may lead to the stop of the system being put into operation and may be
regarded as a delay in acceptance.
Summary of Contents for BioSpec 70/30 USR V2
Page 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Page 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...