Confidential
3-61
(4) Assemble the Lift arm, Feed roller shaft TR and Separation roller drive shaft of the Paper
feed frame unit following the procedure described below.
<Assembling the Lift arm>
Implement the operations below while holding the status described in Step (3).
1) When pushing up the Roller holder ASSY with your hand, the end (section “A”) of the
Lift arm goes down. That makes easy to push the end of the Lift arm under the section
“B” shown in Fig. 3-71.
Fig. 3-70
2) Push up the section “B” of the Side frame L with the end (section “A”) of the Lift arm
and place the section “A” under the section “B”. Then, put the section “A” into the
space between the Hooks B and C inside the machine and assemble the Paper feed
frame unit into the machine.
Fig. 3-71
<Left side>
Lift arm
Paper feed frame unit
Roller holder ASSY
“A”
<Front side>
Paper feed frame unit
“A”
“A”
Side frame L
“B”
“B”
<Front side>
Hook B
Hook C
Summary of Contents for HL-4040CN
Page 265: ...Confidential 4 7 11 Alert warning message of WHQL appears Click Continue Anyway to proceed ...
Page 320: ...Confidential 6 12 Charge High voltage Power Supply PCB Circuit Diagram 1 4 ...
Page 321: ...Confidential 6 13 Charge High voltage Power Supply PCB Circuit Diagram 2 4 ...
Page 322: ...Confidential 6 14 Charge High voltage Power Supply PCB Circuit Diagram 3 4 ...
Page 323: ...Confidential 6 15 Charge High voltage Power Supply PCB Circuit Diagram 4 4 ...
Page 324: ...Confidential 6 16 Transfer High voltage Power Supply PCB Circuit Diagram 1 2 ...
Page 325: ...Confidential 6 17 Transfer High voltage Power Supply PCB Circuit Diagram 2 2 ...
Page 326: ...Confidential 6 18 Low voltage Power Supply PCB Circuit Diagram 100V ...
Page 327: ...Confidential 6 19 Low voltage Power Supply PCB Circuit Diagram 200V ...