3-8
Confidential
CR frame (inner sides of the front and rear upright edges)
Apply a 2 mm diameter ball of grease (FLOIL BG1319) to each of the 60 lubrication points
below.
Lubrication procedure
(1) Move the head/carriage unit to the left end of its travel.
(2) Before applying grease, wipe dust or dirt off the lubrication area with an alcohol soaked
cloth.
(3) Move the head/carriage unit from the left to the right ends of its travel to spread the applied
grease on the CR guide rail and CR frame.
26
34.3
CR guide rail
Lubrication points
CR frame
(mm)
7.65 0.5
3.7 0.5
CR frame
Reference on
the sliding
surface Z
Home position of
head/carriage unit
14.2 mm interval x 30
14.2 mm interval x 30
Lubrication
points
(3_004_S13E)
Summary of Contents for Business Smart MFC-J4510dw
Page 18: ...xv Confidential ...
Page 19: ...xvi Confidential ...
Page 20: ...xvii Confidential ...
Page 22: ...xix Confidential ...
Page 23: ...xx Confidential ...
Page 24: ...xxi Confidential ...
Page 51: ...Confidential 2 14 Error Code Contents Refer to page FE ROM data acquisition error 2 57 ...
Page 130: ...3 3 Confidential 2 PACKING 3_131_E ...
Page 153: ...3 26 Confidential 3 Set the protective part 3_002_E Protective part ...
Page 265: ...4 11 Confidential ADF Copy Chart A B C ...
Page 292: ...5 13 Confidential Scanning Compensation Data List ...
Page 294: ...5 15 Confidential Test Pattern ...
Page 317: ...5 38 Confidential pfadj1 Pattern ...
Page 318: ...5 39 Confidential pfadj2 Pattern ...
Page 324: ...5 45 Confidential Vertical Lines Check Pattern ...
Page 325: ...5 46 Confidential Software Correction for Inclination Corrugation Ruled Lines Check Pattern ...