Confidential
CHAPTER 3 DISASSEMBLY/REASSEMBLY
This chapter describes procedures for disassembling and reassembling the machine with
relates notes. The provided disassembly order flow enables you to take in the disassembly
procedure of related part at a glance.
At the start of disassembling, you can check the disassembly order flow which guides you
through a shortcut to get to the part.
This chapter also covers screw tightening torques and lubrication points where the specified
lubrication should be applied when the machine is assembled.
CONTENTS
9.10 Panel ASSY .............................................................................................................. 3-21
9.11 Panel PCB ASSY / Rubber key / Top cover sensor / Top cover actuator ................. 3-23
9.12 Document detection sensor PCB / Document detection actuator /
9.13 Second side CIS unit ................................................................................................ 3-29
9.14 Top cover / Document guide LS / Document guide RS............................................. 3-30
9.15 Back cover S............................................................................................................. 3-31
9.16 Back cover ................................................................................................................ 3-32
9.17 Power supply PCB ASSY ......................................................................................... 3-33
9.18 Main motor ................................................................................................................ 3-36
9.19 Front cover sensor .................................................................................................... 3-37
Summary of Contents for ADS-2000e
Page 15: ...Confidential CHAPTER 1 SPECIFICATIONS ...
Page 22: ...Confidential CHAPTER 2 TROUBLESHOOTING ...
Page 28: ...2 4 Confidential 2 2 Paper Feeding Fig 2 2 Feed path ...
Page 50: ...Confidential CHAPTER 3 DISASSEMBLY REASSEMBLY ...
Page 54: ...3 2 Confidential 2 PACKING ...
Page 93: ...Confidential CHAPTER 4 ADJUSTING AND UPDATING SETTINGS AS REQUIRED AFTER PARTS REPLACEMENT ...
Page 107: ...Confidential CHAPTER 5 SERVICE FUNCTIONS ...
Page 113: ...Confidential CHAPTER 6 WIRING DIAGRAM ...
Page 116: ...Confidential CHAPTER 7 PERIODICAL MAINTENANCE ...
Page 117: ...Confidential CHAPTER 7 PERIODICAL MAINTENANCE CONTENTS 1 PERIODICAL MAINTENANCE PARTS 7 1 ...
Page 119: ...Confidential APPENDIX 1 SERIAL NUMBERING SYSTEM ...
Page 123: ...Confidential APPENDIX 3 INSTALLING MAINTENANCE DRIVER ...