Centipede 2
®
Module System Instructions
BriskHeat
®
Corporation. All rights reserved
5
Quick Start Guide
1) Install all heaters and ensure that the RTD is making good contact with
the object being heated.
2) Connect modules to heaters. Connect
each heater’s 6-pin power / RTD
connector to each Centipede 2
®
module.
3) Connect each module in the string together using CAT5E communication
cables.
4) Connect the first module to the operator interface using any of the
available input strings (1 - 4).
5) Connect plug in the power to the heaters. Turn on operator interface.
6) In the Global Program menu, se
lect “Global Prog/Select String”. Select
the desired string to program. Set all values for low alarm, set-point, and
high alarm. Individual module settings can be adjusted later.
7) Monitor the Centipede 2
®
system to ensure that each heater achieves its
desired set-point. The time to reach the set-point will vary for each
heater. During this time, you may change individual module settings.
Refer to the rest of this manual for further details and troubleshooting.