background image

2

Phenolic Privacy Restroom Partitions, Floor-to-Ceiling — Series 700, — 69", 72" & 69"/72" Tall

 Installation

6/25/2021 

Bradley • 

HDWC-INSTR-045 Rev. A: ECO 20-14-002S

Safety Information

Warning

Before beginning installation, make sure that the wall and floor backing are adequate to support the secure mounting of the toilet 
compartment units .
Partitions are extremely heavy and may require more than one person to position and install .
Failure to comply with these instructions may result in personal injury and/or property damage and will void the partition warranty .

Caution

Personal protective equipment (PPE) is required during the installation and maintenance of this product .

Notice

To prevent warping, always lay the material flat . Do not lean the material against the wall or stack unevenly .
Make sure all floors and walls are clean and smooth . Remove loose impediments, such as protruding nails and other debris which 
could affect installation . 
To minimize break-out, always use a support block when drilling through the material .
Carefully remove components from skid, do not drag .

Important

Review your partition layout drawings and verify the number of stalls and components before beginning installation . All 
components are labeled with their corresponding part number . Descriptions and part numbers for doors, pilasters, and pilaster 
configurations are listed on pages 4–8 for easy identification .
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department . 
This installation manual provides instruction for the assembly of normal partition configurations and standard components . 
Non-standard configurations or components including but not limited to curved or angled walls, partial walls, oversized panels, or 
modified hardware are not covered in this manual . Compliance and conformity to local codes and ordinances is the responsibility  
of the installer . 

Separate parts from packaging and make sure all parts are accounted for before discarding packaging material . If any parts are 
missing, do not begin installation until you obtain the missing parts . 

Summary of Contents for Bradmar 700 Series

Page 1: ...t Numbers 69 72 7 Pilaster Configurations Wall Hung Part Numbers 8 Layout Dimensions for Brackets 9 Mounting Brackets to Wall 10 Leveling Screws to Pilaster 11 Mounting Brackets to Pilaster 12 13 Pila...

Page 2: ...out always use a support block when drilling through the material Carefully remove components from skid do not drag Important Review your partition layout drawings and verify the number of stalls and...

Page 3: ...3 for gap between door and pilaster Isopropyl alcohol 14 x 5 8 Button Head Sheet Metal Screw Torx T27 Drive FAST S0016 10 x 1 Button Head Sheet Metal Screw Torx T27 Drive FAST S0028 10 24 x 3 8 Button...

Page 4: ...Left Hinge Out W Latch Holes Outside of Stall C490 XX72NSIRH XXXX Right Hinge In Left Hinge Out W Latch Holes C490 XX69NSILH XXXX Left Hinge In Right Hinge Out W Latch Holes Part number logic and desc...

Page 5: ...ch In Right Latch Out C7XXX XX72NSARH XXXX No Site Alcove Right Latch In Left Latch Out C7XXX XX69NIWLH XXXX No Site Wall Left Hinge In Right Hinge Out Outside of Stall C7XXX XXXXNSI35 XXXX No Site Le...

Page 6: ...XXX XXXXNI2RH XXXX No Site Right Hinge In Left Hinge Out C7XXX XXXXNI2LH XXXX No Site Right Hinge Out Left Hinge In C7XXX XXXXNI2CH XXXX No Site Right Hinge In Left Hinge In Right Hinge Out Left Hinge...

Page 7: ...72 Left Latch Out 69 Right Latch Out 72 Left Latch In 72 Right Latch In 69 C7XXX XXNSI35 XXXX No Site Left Latch In 69 Left Hinge Out 72 Right Hinge In 72 Right Latch Out 69 C7XXX XXNI23 XXXX No Site...

Page 8: ...58 XXXXNIWRH XXXX No Site Wall Right Hinge In Left Hinge Out C758 XXXXNIWLH XXXX No Site Wall Left Hinge In Right Hinge Out Part number logic and descriptions for pilasters are based on in swinging do...

Page 9: ...from the floor and place a mark on the pilaster panel plumb line These marks represent the hole centerline of the stirrup brackets Use a level to transfer that mark to all other plumb lines C C Panel...

Page 10: ...Bracket Pilaster bracket is shown here 3 4 19 opening brackets are for pilasters and 1 2 13 opening brackets are for panels 2a Continuous Stainless Steel Brackets to Wall Optional Established Level Li...

Page 11: ...ing Screws to Pilaster 3 16 Pilaster Center and drill a 17 64 pilot hole 1 1 2 38 deep 18 24 Pilaster Drill 2 17 64 pilot holes 1 1 2 38 deep Holes should be 2 51 off each end of the pilaster A 3 16 P...

Page 12: ...rackets to Pilaster Optional Refer to the submittal drawing to locate the split dimension and layout location of each marked pilaster 8 Ceiling Measure down from the top of each pilaster and place a m...

Page 13: ...aster Optional Refer to the submittal drawing for the layout location of each alcove pilaster 8 Ceiling Measure down from the top of the pilaster and place a mark at dimensions shown for the respectiv...

Page 14: ...ween the projected outer edge lines and flush with the projected inside face line 6 24 Pilasters Place 2 L brackets 1 2 13 in from each outer edge line and flush with the projected inside face line B...

Page 15: ...2 for 72 Tall Panels 72 Tall Option Spacer 9 229 for 69 Tall Panels ADA Stall 69 Tall Option Slide a shoe onto the top of the pilaster and use a piece of tape to keep the shoe positioned about 5 127 f...

Page 16: ...on the spacer and insert the panel into the wall brackets A Slide a shoe onto the top pilaster and use a piece of tape to keep the shoe positioned about 5 127 from the end Make sure the shoe mounting...

Page 17: ...walls the gaps range from 1 2 to 1 1 4 13 to 32 Refer to your submittal drawing for your gap sizes Pilasters with Panels Single Panel Refer to your submittal drawing and leave the appropriate gaps St...

Page 18: ...op Refer to your submittal drawing and leave the appropriate gaps Standard gap is 1 25 between the panel and wall and 1 2 13 between the panel and pilaster Refer to your submittal drawing and leave th...

Page 19: ...just to meet the specified dimension A Using the bracket as a template drill 1 4 holes through the pilaster at each pilaster bracket hole Secure the pilaster to the bracket using the 10 24 x 1 2 barre...

Page 20: ...just to meet the specified dimension A Using the bracket as a template drill 1 4 holes through the pilaster at each pilaster bracket hole Secure the pilaster to the bracket using the 10 24 x 1 2 barre...

Page 21: ...ket and align with the established level line Refer to the submittal drawing and adjust to meet the specified dimension A Using the bracket as a template drill 1 4 holes through the pilaster at each p...

Page 22: ...ket and align with the established level line Refer to the submittal drawing and adjust to meet the specified dimension A Using the bracket as a template drill 1 4 holes through the pilaster at each p...

Page 23: ...ter 5 8 16 deep Secure L bracket s to pilaster using the 1 4 x 5 8 screws provided A Using the hole in the top shoe as a template drill a 15 64 hole through the pilaster Secure the top shoe to the pil...

Page 24: ...Pilaster Side Pilaster Side Door Side Cam 2 Left Hand Outswing Right Hand Inswing Right Hand Outswing Left Hand Inswing Refer to your submittal drawings to determine each specific door swing for your...

Page 25: ...nd teeth Insert the hinge pin and cam into the top and middle pilaster leaf The alignment tabs on the cam should fit into the slots on the leaf E Lift the door into place Slide the top and middle door...

Page 26: ...icator circle Verify the red indication color is in the proper position so that red will appear when the latch is in the closed position Using the top countersunk hole in the black disk as a template...

Page 27: ...the pilaster For 34 36 doors mark the location for the top hole on the inside face of the door 36 3 4 933 up from the bottom of 72 tall doors or 33 3 4 781 up from the bottom of 69 tall doors 42 3 4...

Page 28: ...strike to pilaster wall using the 10 x 1 screws provided Q Refer to Step G for installing the keeper and Step J for installing the dampening strip N Refer to Step G for installing the keeper and Step...

Page 29: ...dicator circle Verify the red indication color is in the proper position so that red will appear when the latch is in the closed position Using the top countersunk hole in the black disk as a template...

Page 30: ...the outside face of the door Using the bumper as a template drill 2 11 64 pilot holes 5 8 16 deep Secure to the door using the 10 x 5 8 screws provided J 36 914 A F F Position the coat hook 36 914 ab...

Page 31: ...trike to pilaster wall using the 10 x 1 screws provided R Refer to Step G for installing the keeper and Step K for installing the dampening strip O Refer to Step G for installing the keeper and Step K...

Page 32: ...e Using the bracket as a template mark the hole locations on the wall Remove the bracket and drill a 5 16 hole minimum 2 51 deep at each hole location B Place the urinal screen at dimension D for the...

Page 33: ...een centerline Using the bracket as a template mark the hole locations on the wall Remove the bracket and drill a 5 16 hole minimum 2 51 deep at each hole location B 10a Urinal Screens with Continuous...

Reviews: