background image

Transom Shower

Ensure all relevant personnel read the points

listed below before installation and use of the

equipment.

The Compact Transom Shower Mk2 is intended

to be used as a freshwater external shower for

rinsing off salt water and sand.  It is designed to

be installed in the transom, cockpit or near the

swim platform of a boat.  Use for any other 

purpose or with any other liquid is entirely at the

user's risk.

1.Check that there is enough room for the 

shower hose to retract safely behind the 

mounting surface and for the mixer valve tails to

protrude 

2.To give the maximum effective length of 

shower hose, the mixer valve unit should be as

close as possible to and preferably close to the

handset unit.  Check that when the shower head

is lifted out, the hose will stretch to the required

height and distance.

3.Check there is enough room to plumb the

units in and the plumbing is accessible.

1.Select a suitable flat location and cut out a 

circular hole diameter 82 mm (3¼").

2.Rotate the lid attached to the holder so the

screw holes align and the lid opens vertically up.

3.Position the housing in the hole and use as a

template to mark the position of the 3 fixing

screw holes.

4.Drill 3 x 2.8 mm holes.

5.Secure the holder with the lid attached using

the 3 screws provided.  Ensure they are

screwed in flush with the holder flange.

As it is possible for a small amount of water to

trickle along the shower hose when in operation,

check that there is no possibility of drips 

damaging electrical equipment, furnishings or

contents of locker.

1.Locate the existing water system pipework

and plumb appropriate supply into tap control

unit.

2.Note position of attachment of Hot/Cold water

inputs and Mixed water outputs (See 

diagram overleaf))

3.Attach free end of handset hose securely to

the outlet of the valve unit by suitable method.

(See diagram overleaf)

4.Ensure all connections are water tight. Note

'O' ring and washers included with fittings; do

not use plumbing tape (PTFE) on joints.

Safety

1.Open lid by gripping on external tabs and

pulling outwards until it locks into upright 

position.

2.The shower handset is extracted by grasping

it and pulling it out of holder.

3.Set temperature carefully ensuring the valve

is at cold only (fully turned to the right) and 

gradually increase the warm water input until

desired temperature is reached.

4.After use ensure valve is in the fully closed (off

position) and replace the handset in the holder.

Push to locate firmly.

5.Close lid carefully into the down position. The

lid is spring closed and will snap shut. Take care

to ensure fingers are not on the inside of the lid

at this point.

Application

To the Fitter/ User

Mounting

Assembly

Plumbing

Before Installation

Operation

Reviews: