3-19
Section 3 • Systems & Components Overview & Operation
370 Outrage
R
Section 3 • Systems & Components Overview & Operation
Raw Water Washdown
Fig. 3.19.1
Raw Water Washdown
The raw water washdown hose connection is located
on the port midship wall of the cockpit (Figure
3.18.1). The fitting allows for connection of a
common garden hose. It is important that the cap
which is tethered to the connection be screwed onto
the fi tting when it is not being used. The raw water
washdown is supplied by a pump activated by the
“RAW WATER” switch on the bait prep switch panel
(Figure 3.17.1).
Maintenance
Maintenance of the raw water system requires
periodic inspection of the raw water intake strainer
and all fi ttings and hoses for system integrity to
prevent leaks.
Clean away debris and/or tighten hose connections
as required. The system should be run at least every
other month to keep the pumps impellers in good
condition.
PORT GUNNEL
RAW WATER WASHDOWN FITTING
PORT TROLLING SEAT (OPTION)
1
2
3
1
2
3
Summary of Contents for 370 Outrage
Page 2: ......
Page 20: ...xx 370 Outrage R THIS PAGE INTENTIONALLY LEFT BLANK...
Page 162: ...4 16 370 Outrage Section 4 Electrical System R Battery Diagram Sheet 1 Fig 4 16 1...
Page 164: ...4 18 370 Outrage Section 4 Electrical System R Helm Breaker Panel Sheet 3 Fig 4 18 1...
Page 168: ...4 22 370 Outrage Section 4 Electrical System R Windlass Schematic Sheet 7 Fig 4 22 1...
Page 170: ...4 24 370 Outrage Section 4 Electrical System R DC Distribution Panel Sheet 9 Fig 4 24 1...
Page 172: ...4 26 370 Outrage Section 4 Electrical System R Hardtop Scematic Sheet 11 Fig 4 26 1...
Page 180: ...4 34 370 Outrage Section 4 Electrical System R Bilge Wiring Schematic Sheet 19 Fig 4 34 1...