11 Final activities
11.1 Checking the installation
In addition to the checks on page 33, you must check
the following:
– Are all collector and roof cover joints snow and rain
proof?
11.2 Insulating the connection and header
pipes
Insulation of header pipes
– For the insulation of internal pipework, use only high
temperature resistant insulating materials.
i
USER NOTE
If you are venting the solar heating sys-
tem with an automatic air-vent valve (ac-
cessory), you must close the ball valve
after the venting procedure (see pump
station installation instructions).