40/56
Press modules Type IH04
| Decommissioning
Bosch Rexroth AG, Edition 08.2021, RE 63124-B
11 Decommissioning
▶ Decommission the overall machine/system as described in the overall
machine/system operating instructions.
▶ Do not loosen any pipes/hoses, connections and components.
▶ Measure the pressure at the measuring points provided for this purpose.
In the decommissioning of the press module, the following must be observed:
▶ Move the cylinder piston to a fall-proof parking position, switch off pumps
and electric motors, relieve the accumulators and secure the machine/system
against restarting.
▶ Provide collecting containers that are large enough to accommodate the
total hydraulic fluid volume at the press module including the pipework to
the top oil tank.
Prepare disassembly of the press module as follows:
▶ Connect the pressure gauge to the measuring points Mxx and drain the hydraulic
fluid into a suitable oil tray until the pressure has completely dissipated.
▶ Keep the disassembly tools and suitable lifting devices ready.
You can now start the disassembly.