Commissioning 39/56
RE 91071-01-B/06.2018, A2FM/A2FE/A2FMT Series 70,
Bosch Rexroth AG
8 Commissioning
wARnInG
Danger while working in the danger zone of a machine/system!
Risk of death or serious injury!
▶
Pay attention to and eliminate potential danger sources before operating the
axial piston unit.
▶
Make sure no one is in the danger zone of the machine/system.
▶
The emergency stop button for the machine/system should be within the
operator’s reach.
▶
Always follow the instructions of the machine/system manufacturer during
commissioning.
CAUTIOn
Commissioning an improperly installed product!
Risk of injury and property damage!
▶
Make sure that all electrical and hydraulic ports are connected or plugged.
▶
Only commission a completely installed, fully functioning product with original
accessories from Bosch Rexroth.
8.1 Initial commissioning
During all commissioning work on the axial piston unit, observe the general safety
instructions and intended use detailed in chapter 2 “Safety instructions” on
page 8.
▶
Connect the pressure gauge for the working pressure and case pressure to the
specified measuring points on the axial piston unit or in the hydraulic system to
check the technical data during the first operation.
▶
During commissioning, monitor the temperature of the hydraulic fluid in the
reservoir to ensure that it lies within permissible viscosity limits.